Inspections for the day of: Monday, March 2, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00532 Tracking Control2/27/20093/2/20093/2/2009 4:02:11 PMAPART
Storm drained cleaned and external protection surrounding it. Need to clean up parking lot on a daily basis
ESC06-01097 Site Final3/2/20093/2/20093/2/2009 3:56:38 PMPPASS
ESC06-01091 DOC - Permit Finaled3/2/20093/2/20093/2/2009 3:51:20 PMPPASS
ESC06-01096 Site Final3/2/20093/2/20093/2/2009 3:49:47 PMPPASS
ESC08-00455 General Inspection3/2/20093/2/20093/2/2009 2:05:18 PM DONE
All work completed.
ESC08-00455 Site Final3/2/20093/2/20093/2/2009 2:05:06 PMPPASS
ESC04-01055 BMP Violation3/2/20093/2/20093/2/2009 1:16:56 PMPCANC
Wrong date.
ESC09-00070 Site Preparation ESC3/2/20093/2/20093/2/2009 1:15:51 PM PART
Could not reach RP the number is temporary disconnected.
Need to post ESC sign.
ESC08-00411 General Inspection3/2/20093/2/20093/2/2009 1:15:08 PM PASS
Waitinng on final landscape.
ESC04-01055 Complaint Inspection3/2/20093/2/20093/2/2009 1:00:46 PMAFAIL
Verbal to Contractor:
Spoke with Shane Jayo over lot 44 Blk4 of the sub-division on erosion occuring on the lot where a gully is genterating from storm runoff of of the lot. Gave the contractor until 3/6/09am to install erosion and sediment control and to fix the gully cut on the slope of the lot down to the street. Will re-inspect on 3/6/09 PM.
ESC06-01096 DOC - Permit Finaled3/2/20093/2/20093/2/2009 10:03:06 AMAPASS
ESC08-00457 General Inspection2/19/20093/2/20093/2/2009 10:01:04 AMAPASS
Installed a new washout pit.
ESC08-00094 Complaint Inspection3/2/20093/2/20093/2/2009 10:00:30 AMADONE
No issues present. ent over procedures contractor and what actually occured.