ESC09-00286
| General Inspection | 3/1/2010 | 3/2/2010 | 3/2/2010 3:25:59 PM | P | PART |
|
|
Minimal controls in place but no discharge is apparent. Additional rock on entrances should be installed, informed RP.
|
ESC09-00352
| General Inspection | 2/26/2010 | 3/2/2010 | 3/2/2010 3:06:32 PM | P | PART |
|
|
Met with RP, Gary Howard and Clint Smith. Discussions regarding upcoming pedestrian bridge across Walling's Creek. Recommended silt curtain downstream of project. Also, at NW side of project additional sediment barriers are needed since the elevation of site has been raised. Discussion regarding stabilization, Ok by us to have a green zone around the perimeter of the park and then a top layer of angular rock on top of the pit run as well as for the main park road until asphalt is layed.
|