Inspections for the day of: Tuesday, March 2, 2010.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00322 FIRE-Final Inspection2/26/20103/2/20103/2/2010 3:55:19 PMPCANC
Cancelled per voice message left by Doug. I performed a courtesy inspection since I was in the area and found the fire extinguishers tagged, the address in place, pump signage in place, emergency pump shutoff in place, emergency lights and exits signs functional, and exit door hardware appeared correct. No sign off was given until Doug calls the inspection back in.
FIR09-00707 INSP-Sprinkler Rough-in3/2/20103/2/20103/2/2010 3:21:25 PMPCANC
John was not quite ready for inspection when I was available so we've rescheduled for first thing tomorrow morning.
BLD09-01625 FIRE-Final Inspection3/1/20103/2/20103/2/2010 3:13:50 PMAFAIL
See the redline comments on the city approved plans which include providing approved hardware on all of the doors as per the scope of work and provide annual inspection for the fire extinguisher.
FIR09-00734 INSP-Sprinkler Rough-in3/1/20103/2/20103/2/2010 3:12:02 PMAPART
Plans need to be resubmitted showing the pipe routing changes and pipe size changes. These changes include the near main being relocated roughly 18' to the south and 3" riser nipples at all branchline/main connection points on both the near and far mains. The sprig ups are marked on the plans to be 1 1/4" but 1 1/2" have been installed. Insulation is laying on the upright sprinkler heads in several locations in the warehouse area. Two office areas near the riser room will have a combustible concealed space above the ceilings but Doug is going to cover with sheet rock. I gave the ok to cover some of the piping in the office area. See the approved plans for exact area.