FIR10-00569
| INSP-Conference | 3/2/2011 | 3/2/2011 | 3/3/2011 5:01:00 PM | P | DONE |
|
|
Site visit regarding suspended light fixture placement at the east side main level. Upright sprinkler protection does not appear obstructed as currently installed.
|
BLD11-00032
| FIRE-Final Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 4:30:05 PM | P | PASS |
|
|
Fire life safety passed with the exception of surface mounted hasps and locks at the west and south exit doors to be removed prior to occpancy as discussed.
|
FIR11-00091
| INSP-Final Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 4:27:27 PM | P | PASS |
|
|
Scope of fire sprinkler work passed inspection. Permit finaled.
|
BLD10-01525
| FIRE-Sprinkler Rough-in | 3/2/2011 | 3/2/2011 | 3/2/2011 4:26:12 PM | P | PART |
|
|
Okay to cover overhead fire sprinkler modifications at the drop ceilings.
|
FIR10-00006
| INSP-Final Inspection | 2/18/2011 | 3/2/2011 | 3/2/2011 4:24:24 PM | A | PART |
|
|
Tested fire alarm notification and initiating devices on the 2nd -7th floor tower levels, verified previous correction items are finished, booster 2 nac 3 first floor is not functional, add TS at the antifreeze loop to the points map, adjust cd and spacing at area D 2nd and 3rd floors as noted.
|
BLD11-00062
| FIRE-Final Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 4:19:00 PM | A | PART |
|
|
Door hardware and fire sprinkler work has been finished. Final pending alarm system permit work.
|
BLD10-02344
| FIRE-Final Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 4:17:05 PM | A | PASS |
|
|
Fire life safety finaled.
|
BLD10-02879
| FIRE-Final Inspection | 3/1/2011 | 3/2/2011 | 3/2/2011 4:12:54 PM | A | FAIL |
|
|
New walls have created spacing and obstruction issues with the existing fire sprinkler and alarm systems. Modifications to maintain and continue protection will be necessary via approved FIR permit work-
|