ESC10-00531
| General Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 2:57:25 PM | | PART |
|
|
Overall things appear ok, operator needs to stabilize bare ground. Time of year is now idea for initiation of this stabilzation.
|
ESC10-00582
| General Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 9:59:17 AM | | PASS |
|
|
|
ESC11-00018
| General Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 9:24:53 AM | A | PASS |
|
|
Reviewed dewatering activities with RP, Ryan S. water to be clean prior to entering drop inlet or activities to cease. Install dirt bag in grassy area and double protect drop inlet in parking lot.
|
ESC11-00081
| General Inspection | 2/28/2011 | 3/2/2011 | 3/2/2011 9:23:09 AM | A | PASS |
|
|
DEWATERING. Reviewed dewatering process with RP (Ryan). Dirt bag, and double protect storm drain, water to be clean upon entering into the drop inlet or cease activities.
|