Inspections for the day of: Wednesday, March 2, 2011.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00067 INSP-Conference3/2/20113/2/20113/2/2011 3:51:45 PMPDONE
I went over duct detector placement with Greg.
FIR10-00514 INSP-Sprinkler Rough-in3/1/20113/2/20113/2/2011 3:09:03 PMPPASS
Todays inspection was just for the rough-in on the second floor mains, branchlines and arm overs. Additional inspections will be required once the ceiling grid has been installed to verify final pendant sprinkler spacing.
FIR10-00655 INSP-Final Inspection3/2/20113/2/20113/2/2011 3:03:51 PMPFAIL
Replace the painted sprinkler pendants. Replace the painted eschuteons. Replace the missing eschuteons.
FIR10-00610 INSP-Final Inspection3/1/20113/2/20113/2/2011 2:57:25 PMAPASS
Permit finaled
FIR10-00107 INSP-Final Inspection2/23/20113/2/20113/2/2011 12:23:53 PMAPASS
permit finaled
FIR10-00108 INSP-Final Inspection2/23/20113/2/20113/2/2011 11:26:53 AMAPASS
Permit finaled