FIR14-00531
| INSP-Sprinkler Rough-in | 2/27/2015 | 3/2/2015 | 3/6/2015 2:43:56 PM | A | PART |
|
|
Requesting inspection on the 3rd ; 4th floor. Nate M is your contact on site. Please call 1/2 hour prior to inspection. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR15-00106
| INSP-Sprinkler Rough-in | 3/2/2015 | 3/2/2015 | 3/2/2015 3:35:50 PM | P | PART |
|
|
Completed inspection for overhead fire sprinkler system modifications at the remodel area. Noted three existing heads recommended for replacement due to visible corrosion at the seats including office #1, above refreshments counter, and above the new interior overhead door.
|
BLD14-03485
| FIRE-Final Inspection | 2/27/2015 | 3/2/2015 | 3/2/2015 2:52:29 PM | A | PASS |
|
|
Verified previous correction items for completion. Fire life safety passed.
|
FIR15-00027
| INSP-Final Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 2:50:56 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
BLD14-00936
| FIRE-Final Inspection | 2/27/2015 | 3/2/2015 | 3/2/2015 12:36:35 PM | A | FAIL |
|
|
Need to provide approved hardware per approved plans, last inspection activity notes dated 7/29/14 and today's on site discussion with property rep.
|
FIR14-00410
| INSP-Final Inspection | 2/23/2015 | 3/2/2015 | 3/2/2015 12:33:36 PM | A | PART |
|
|
Completed functional testing of the new fire alarm panel. Final pending signage at the doors leading to the FACP, knox box install. Refer to fire code review notes for details.
|