BLD14-01829
| BLD-Wall cover | 2/29/2016 | 3/2/2016 | 3/2/2016 5:17:14 PM | P | DEFR |
|
|
RC channel inspection 1st floor west half Phone #: ###-#### Inspection requested via web by Corey Hockersmith thur am
|
BLD15-01982
| BLD-Final | 3/1/2016 | 3/2/2016 | 3/2/2016 5:15:22 PM | P | DEFR |
|
|
Garrett Phone #: ###-#### out of time
|
BLD15-01585
| BLD-Wall cover | 3/1/2016 | 3/2/2016 | 3/2/2016 4:26:39 PM | A | PASS |
|
|
ceilling
|
BLD15-03593
| BLD-Conference | 3/2/2016 | 3/2/2016 | 3/2/2016 4:09:34 PM | P | FAIL |
|
|
Pre-Final walk/ review of space prior to ceiling cover Phone #: ###-#### Inspection requested via web by Wayne Berry need landing at exit
|
BLD16-00405
| BLD-Footing | 3/2/2016 | 3/2/2016 | 3/2/2016 2:22:57 PM | P | PASS |
|
|
Jose Phone #: rade back fill required and drainage sys. footting to min.24 in
|
BLD15-03826
| BLD-Final | 3/2/2016 | 3/2/2016 | 3/2/2016 11:53:03 AM | P | PASS |
|
|
Marvin Phone #: ###-#### need zonning signoff
|
BLD15-03765
| BLD-Final | 3/1/2016 | 3/2/2016 | 3/2/2016 11:16:48 AM | A | PASS |
|
|
CUSTOMER MAY OR MAY NOT BE PRESENT FOR INSPECTION Phone #: ###-#### Inspection requested via web by Naida Khan
|
BLD15-03765
| DOC - Permit Finaled | 3/2/2016 | 3/2/2016 | 3/2/2016 11:16:11 AM | P | PASS |
|
|
|
BLD15-03766
| BLD-Final | 3/1/2016 | 3/2/2016 | 3/2/2016 11:05:35 AM | A | FAIL |
|
|
CUSTOMER MAY OR MAY NOT BE PRESENT FOR INSPECTION Phone #: ###-#### Inspection requested via web by Naida Khan 45 min rated windows required per bld14-01653
|
BLD15-00516
| BLD-Framing/Rough-in | 3/1/2016 | 3/2/2016 | 3/2/2016 10:40:31 AM | A | PASS |
|
|
Bob Phone #: ###-#### first floor ceilling ok to cover
|
BLD15-03146
| BLD-Conference | 2/29/2016 | 3/2/2016 | 3/2/2016 7:29:58 AM | A | CANC |
|
|
Meet at Greg''s cube Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|