ELE16-00647
| Electrical Rough-In | 3/2/2016 | 3/2/2016 | 3/2/2016 3:25:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by PAUL PINNEY upstairs kitchen and bath plus downstairs rough-in ok cover service change on a later date to upgrade service ok cover
|
ELE16-00187
| Final | 3/1/2016 | 3/2/2016 | 3/2/2016 3:16:51 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley not ready
|
ELE15-03843
| Final | 3/2/2016 | 3/2/2016 | 3/2/2016 1:51:08 PM | P | FAIL |
|
|
Call half hour before // Mike Phone #: ###-#### 210.8 (a)(7) receptacles within 6' of a sink shall have GFCI 422.31 fixed appliances shall have means of lockout Contractor shal provide a extension ladder to verify up lofts install
|
ELE13-02131
| Final | 3/2/2016 | 3/2/2016 | 3/2/2016 12:45:47 PM | P | PASS |
|
|
Inspection requested via web by Cilnt Pierce final ok
|
ELE16-00503
| Final | 3/1/2016 | 3/2/2016 | 3/2/2016 9:59:45 AM | A | PASS |
|
|
Derik Phone #: ###-#### correction fixed final ok
|
ELE12-02398
| ELE-Aging Inspection | 3/2/2016 | 3/2/2016 | 3/2/2016 9:44:14 AM | | PASS |
|
|
too busy
|
ELE11-01976
| ELE-Aging Inspection | 3/2/2016 | 3/2/2016 | 3/2/2016 9:42:36 AM | | PASS |
|
|
Talked with Terry he said that it will be called in soon
|
ELE16-00624
| Final | 3/1/2016 | 3/2/2016 | 3/2/2016 9:29:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown correction fixed t/s o/h n ok
|
ELE16-00605
| Temporary Service | 3/1/2016 | 3/2/2016 | 3/2/2016 8:47:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman t/s o/h n ok
|
ELE16-00329
| Electrical Rough-In | 3/1/2016 | 3/2/2016 | 3/2/2016 7:26:30 AM | A | CANC |
|
|
4th Floor rough-in Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|