FIR15-00425
| INSP-Sprinkler Rough-in/Hydro | 3/2/2016 | 3/2/2016 | 3/2/2016 3:17:34 PM | P | PASS |
|
|
Hydrostatic test, 2hrs @ 200psi passed/complete for overhead sprinkler piping.
|
FIR15-00588
| INSP-Sprinkler Rough-in/Hydro | 3/1/2016 | 3/2/2016 | 3/2/2016 3:16:03 PM | P | PASS |
|
|
Hydrostatic test, 2hrs @ 200psi passed/complete for 3rd level.
|
FIR15-00795
| INSP-Sprinkler Rough-in | 3/2/2016 | 3/2/2016 | 3/2/2016 3:03:07 PM | P | PASS |
|
|
Rough to cover inspection complete for 1st level, all of 1st level approved for cover. Contractor will schedule inspection for 2nd level when tenting is complete.
|
FIR15-00738
| INSP-Sprinkler Rough-in | 3/2/2016 | 3/2/2016 | 3/2/2016 3:01:20 PM | P | PASS |
|
|
Rough to cover inspection for overhead piping complete, approved for cover.
|
FIR15-00879
| INSP-Final Inspection | 3/1/2016 | 3/2/2016 | 3/2/2016 10:16:42 AM | A | PASS |
|
|
FInal fire sprinkler inspection passed/complete
|