MEC17-00417
| Rough-in | 3/1/2017 | 3/2/2017 | 3/3/2017 10:01:18 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- MB1.1 note 7 says outside air(fresh air) needs to be ducted to R/A- resubmit drawings when engineer address issue- left correction notice on front window-
|
MEC17-00774
| Final | 3/1/2017 | 3/2/2017 | 3/2/2017 4:07:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Justin Osterhout
|
MEC17-00774
| Rough-in | 3/1/2017 | 3/2/2017 | 3/2/2017 4:04:40 PM | P | CANC |
|
|
Fue Pressure test Phone #: ###-#### Inspection requested via web by Justin Osterhout- flue pressure did not need witnessed
|
MEC17-00162
| Final | 3/2/2017 | 3/2/2017 | 3/2/2017 3:32:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables
|
MEC17-00161
| Final | 3/2/2017 | 3/2/2017 | 3/2/2017 3:17:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables
|
MEC17-00540
| Pressure Test | 3/1/2017 | 3/2/2017 | 3/2/2017 2:45:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- 20lb gas pass
|
MEC16-03414
| Mec-Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 1:32:54 PM | | PEND |
|
|
contractor will schedule
|
MEC16-03413
| Mec-Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 1:32:17 PM | | PEND |
|
|
contractor will schedule
|
MEC17-00772
| Final | 3/1/2017 | 3/2/2017 | 3/2/2017 1:28:37 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jamie Scibior- single wall pipe needs 6 inch clearance to combustibles all sides- talk to contractor
|
MEC17-00772
| Rough-in | 3/1/2017 | 3/2/2017 | 3/2/2017 1:27:44 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Jamie Scibior
|
MEC17-00589
| Final | 3/1/2017 | 3/2/2017 | 3/2/2017 1:08:19 PM | P | PEND |
|
|
Would like between 12-2 and call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria- need co detectors installed
|
MEC17-00775
| Pressure Test | 3/1/2017 | 3/2/2017 | 3/2/2017 12:46:50 PM | A | PASS |
|
|
This is for mid AM if possible. Please call Miguel B4 arrival. Thank you! Phone #: ###-#### Inspection requested via web by Diane Day- 2lb gas pass
|
MEC16-03429
| Mec-Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 10:20:20 AM | | PEND |
|
|
contractor will fix correction on line set and schedule
|
MEC17-00011
| Rough-in | 3/1/2017 | 3/2/2017 | 3/2/2017 8:20:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart
|