ELE12-00989
| ELE-Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 1:12:23 PM | | FAIL |
|
|
I called and left message on 12/9/16. No inspection requested at this time.
|
ELE17-00264
| Final | 3/1/2017 | 3/2/2017 | 3/2/2017 12:43:57 PM | P | PASS |
|
|
This Is All Done And Finished The Homeowners Will Be Home to Allow You Access Thanks Again For All Your help On This Project! Dave ###-#### Phone #: ###-#### Inspection requested via web by jason shifflett Ok final
|
ELE17-00203
| Electrical Rough-In | 3/2/2017 | 3/2/2017 | 3/2/2017 12:03:37 PM | P | PASS |
|
|
Need floor heat inspection. Please call Jim (###-####) 30 minutes ahead for access Phone #: ###-#### Inspection requested via web by Brad Girard ok cover floorheat
|
ELE17-00526
| Electrical Rough-In | 3/1/2017 | 3/2/2017 | 3/2/2017 10:28:35 AM | A | PASS |
|
|
Basement rough-in Phone #: ###-#### Inspection requested via web by Kevin Burke ok cover
|
ELE17-00362
| Electrical Rough-In | 3/1/2017 | 3/2/2017 | 3/2/2017 10:09:31 AM | A | PASS |
|
|
need floor heat inspection will be ready after 10 if possible call rory at ###-#### for access ty Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover floorheat
|
ELE16-02969
| Final | 3/1/2017 | 3/2/2017 | 3/2/2017 9:57:37 AM | A | PASS |
|
|
Work was done in the basement. There is a door on the south side of the house to go into the basement. If door is still locked please give me a call. Thank you david. Phone #: ###-#### Inspection requested via web by Charmel Kubik Ok final
|
ELE13-02106
| ELE-Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 7:06:00 AM | | DONE |
|
|
Contractor was contacted on 2/17/16 for a final. No inspection requested at this time.
|