NAF16-00064
| INSP-Sprinkler Rough-in/Hydro | 3/2/2017 | 3/2/2017 | 3/2/2017 4:28:55 PM | P | PART |
|
|
Hydrostatic test completed satisfactory. Rough-in of basement completed.
*Need to verify if sprinkler head type needs to be changed in basement do to partial finished status*
|