FIR16-00468
| INSP-Final Inspection | 2/28/2017 | 3/2/2017 | 3/2/2017 3:11:25 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete.
|
BLD14-03081
| FIRE-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 3:04:03 PM | P | DONE |
|
|
Items needed before final life fire safety inspection: knox box needs to be installed, signage for fire alarm control panel and fire sprinkler riser room, gas piping and cpvc piping that is currently exposed in the south stairwell need to be enclosed in a hour fire rated assembly, bell needs to be installed by the fire department connection and addressing needs to be a minimum 4 inch tall numbers with and a minimum stroke width of half an inch.
|
BLD14-03228
| FIRE-Final Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 2:57:46 PM | P | PASS |
|
|
Final life fire safety inspection passed/complete
|
BLD14-03229
| FIRE-Final Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 2:57:15 PM | P | PASS |
|
|
Final life fire safety inspection passed/complete
|
FIR15-00304
| INSP-Final Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 2:53:55 PM | P | PASS |
|
|
Final fire sprinkler inspection pased/complete.
|
FIR16-00299
| INSP-Sprinkler Rough-in | 3/1/2017 | 3/2/2017 | 3/2/2017 11:33:50 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads in hotel resident rooms on level 5 complete, hotel resident rooms on level 5 approved for cover.
|
FIR16-00299
| INSP-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 11:32:04 AM | A | DONE |
|
|
Temporary standpipe for fire department use partially complete, contractor has hose valves on order, when valves are recieved they will installed with the FDC hookup.
|
FIR16-00299
| INSP-Sprinkler Rough-in/Hydro | 3/1/2017 | 3/2/2017 | 3/2/2017 11:17:34 AM | A | PART |
|
|
Hydrostatic test for the level 4 complete.
|
FIR16-00267
| INSP-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 8:36:11 AM | A | DONE |
|
|
Temporary standpipe is in place, located on the south side (Myrtle is the access street for FDC connection) of building.
|