ELE19-04863
| Final | 3/2/2020 | 3/2/2020 | 3/2/2020 1:45:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt corrections made final ok
|
ELE20-00210
| Electrical Rough-In | 3/2/2020 | 3/2/2020 | 3/2/2020 1:27:42 PM | P | PASS |
|
|
EQ bonding for swimming pool. Prepped for pavers Phone #: ###-#### Inspection requested via web by Lars Johnson eq bond only ok
|
ELE19-04816
| Electrical Rough-In | 3/2/2020 | 3/2/2020 | 3/2/2020 1:25:08 PM | P | PASS |
|
|
EQ bonding for swimming pool. Phone #: ###-#### Inspection requested via web by Lars Johnson eq bond only ok
|
ELE20-00508
| Rough-In Permanent Service | 2/28/2020 | 3/2/2020 | 3/2/2020 12:55:15 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Ballard Corrections made rough in ok p/s u/g n ok
|
ELE20-00589
| Rough-In Permanent Service | 2/28/2020 | 3/2/2020 | 3/2/2020 12:11:20 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk rough in ok p/s u/g n ok
|
ELE19-03759
| Final | 3/2/2020 | 3/2/2020 | 3/2/2020 12:01:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan pool and spa final ok
|
ELE19-02700
| Electrical Rough-In | 2/27/2020 | 3/2/2020 | 3/2/2020 11:25:05 AM | A | PASS |
|
|
Contact Brandon for west and north lightning protection ground loop system. Phone #: ###-#### Inspection requested via web by Tom Betty Remaining ground loop ok to cover
|
ELE20-00274
| Permanent Service | 3/2/2020 | 3/2/2020 | 3/2/2020 11:02:23 AM | P | PASS |
|
|
Inspection on new meter pack Phone #: ###-#### Inspection requested via web by Emmet Bushman p/s u/g rec ok 2 meters
|
ELE20-00715
| Temporary Service | 2/28/2020 | 3/2/2020 | 3/2/2020 10:50:57 AM | A | FAIL |
|
|
Pole is located in NE Corner or property behind garage. Phone #: ###-#### Inspection requested via web by Tony Koonce 590.6B1 All Temporary receps shall have GFCI protection (50A recep below panel)
|
ELE20-00714
| Final | 2/28/2020 | 3/2/2020 | 3/2/2020 10:34:25 AM | A | NR |
|
|
It will be open. If you have any questions please feel free to contact Jared ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan See rough in notes
|
ELE20-00714
| Electrical Rough-In | 2/28/2020 | 3/2/2020 | 3/2/2020 10:33:50 AM | A | FAIL |
|
|
It will be open. If you have any questions please feel free to contact Jared ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan 110.12A All unused openings shall be closed. (Open breaker space in panel) 110.3 Properly install panel dead front. 422.30 Disc shall be provided for all perminantly installed appliances. (Disc shall be within sight of furnace as per manufacturer instructions)
|
ELE20-00720
| Electrical Rough-In | 3/1/2020 | 3/2/2020 | 3/2/2020 9:50:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jesse Fuentes Hot tub is located in sun room. Discussed bonding metal frame of structure to hot tub. Rough in ok
|
ELE19-04863
| Final | 2/28/2020 | 3/2/2020 | 3/2/2020 9:26:52 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt 110.3 Master bed receps hot - ground reverse, Master bed, bath and closet lights dead.
|
ELE19-00847
| Final | 2/29/2020 | 3/2/2020 | 3/2/2020 9:07:47 AM | A | PASS |
|
|
Partial final inspection. Thank you Phone #: ###-#### Inspection requested via web by Stuart Welton Exterior lights have been installed Partial final ok
|