BLD95-02116
| INSP - Foundation | 3/20/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | | PASS |
|
|
/ / 316 - Re-bar inspection..OK as per engineering notes.
|
BLD96-00102
| INSP - Final | 3/20/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | | CANC |
|
|
ISSUED C OF C #10998 THIS DATE BY 301.
|
BLD96-00371
| INSP - Framing/Rough-in | 3/19/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | A | FAIL |
|
|
03/19/96 316 - A.M. LATE Not Ready
|
MEC96-00831
| INSP - Rough-in & Gas Pressure | 3/19/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | A | PASS |
|
|
03/19/96 316 - Tag #028499
|
BLD96-00415
| INSP - Footings | 3/19/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | A | PASS |
|
|
03/19/96 316 - OK
|
BLD96-00415
| INSP - Footings | 3/20/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | P | PASS |
|
|
03/20/96 316 - Foundation OK
|
BLD95-01578
| INSP - Carpentry | 3/20/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | P | PASS |
|
|
|
BLD95-01907
| INSP - Footings | 3/20/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | P | PART |
|
|
03/20/96 316 - Footings and stem walls poured about 6-8 months prior to inspection....has been backfilled...from what I can see and in talking with the owner, the footing seems to be marginal and minimum
|
BLD96-00371
| INSP - Framing/Rough-in | 3/20/1996 | 3/20/1996 | 3/20/1996 12:00:00 AM | P | FAIL |
|
|
03/20/96 316 - Correction notice....not ready..no air infl. pkg. or elec
|