BLD00-03697
| BLD-Framing/Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | NR |
|
|
###-####; recall, need elec 1st 3/20/2001 9:59:04 AM
|
BLD99-03148
| BLD-Framing/Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | PART |
|
|
###-####; 3rd fl, west area & annex. Need detail for spans of 15/8" 20ga. clg joists at corridor; eng'r to approve 16" cored holes for ducts at seismic frame (new const.)Ok to cover exc. as noted.. 3/20/2001 10:46:57 AM
|
BLD01-00280
| BLD-Framing/Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | PART |
|
|
###-#### ###-#### walls ok 3/20/2001 4:19:05 PM
|
BLD00-03176
| BLD-Framing/Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | FAIL |
|
|
###-#### c/n, nr, partial courtesy insp 3/20/2001 12:15:30 PM
|
BLD00-01649
| BLD-Other | 3/19/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 11:58:57. Contact: ###-####... 3/23/2001 5:36:08 PM wip. need details for top of shaft; replace shaft wall as needed 3/23/2001 5:36:53 PM
|
BLD01-00183
| BLD-Foundation | 3/19/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | PASS |
|
|
you can get through the gate.... Chris ###-#### forms in place, ok 3/20/2001 9:53:20 AM
|
BLD00-03538
| BLD-Footing | 3/19/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 15:04:58. Contact: ###-####.
|
BLD00-02175
| BLD-Conference | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/20/2001 10:02:27 AM w/ bldr re firestops at lids
|
BLD00-02779
| BLD-Conference | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/20/2001 1:48:22 PM w/ Cathy Seewall of ZGA ...need historic review for change to rails.
|
BLD00-02752
| BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 07:42:13. Contact: ###-####. center area, seal/ fireblock; add straps; engr to chk holes at joists 3/20/2001 6:03:39 PM
|
BLD00-02242
| BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 08:18:33. Contact: ###-####...ok to cover west end corridor 3/20/2001 6:00:36 PM
|
BLD00-02318
| BLD-Final | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | PART |
|
|
Harry ###-####, final ok this portion,( w/ BLD00-00758... has struct c/n on seismic, need report) 3/20/2001 4:18:35 PM
|
BLD00-00758
| BLD-Final | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | FAIL |
|
|
Harry ###-####; keep c/n need stamped eng'r's observation; fix rear door threshhold...too high 3/20/2001 4:15:00 PM 3/20/2001 4:16:25 PM
|