Inspections for the day of: Tuesday, March 20, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03697 BLD-Framing/Rough-in3/19/20013/20/20013/20/2001 12:00:00 AMANR
###-####; recall, need elec 1st 3/20/2001 9:59:04 AM
BLD99-03148 BLD-Framing/Rough-in3/19/20013/20/20013/20/2001 12:00:00 AMAPART
###-####; 3rd fl, west area & annex. Need detail for spans of 15/8" 20ga. clg joists at corridor; eng'r to approve 16" cored holes for ducts at seismic frame (new const.)Ok to cover exc. as noted.. 3/20/2001 10:46:57 AM
BLD01-00280 BLD-Framing/Rough-in3/19/20013/20/20013/20/2001 12:00:00 AMAPART
###-#### ###-#### walls ok 3/20/2001 4:19:05 PM
BLD00-03176 BLD-Framing/Rough-in3/19/20013/20/20013/20/2001 12:00:00 AMAFAIL
###-#### c/n, nr, partial courtesy insp 3/20/2001 12:15:30 PM
BLD00-01649 BLD-Other3/19/20013/20/20013/20/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/19/2001 at 11:58:57. Contact: ###-####... 3/23/2001 5:36:08 PM wip. need details for top of shaft; replace shaft wall as needed 3/23/2001 5:36:53 PM
BLD01-00183 BLD-Foundation3/19/20013/20/20013/20/2001 12:00:00 AMAPASS
you can get through the gate.... Chris ###-#### forms in place, ok 3/20/2001 9:53:20 AM
BLD00-03538 BLD-Footing3/19/20013/20/20013/20/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/19/2001 at 15:04:58. Contact: ###-####.
BLD00-02175 BLD-Conference3/20/20013/20/20013/20/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 3/20/2001 10:02:27 AM w/ bldr re firestops at lids
BLD00-02779 BLD-Conference3/20/20013/20/20013/20/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 3/20/2001 1:48:22 PM w/ Cathy Seewall of ZGA ...need historic review for change to rails.
BLD00-02752 BLD-Framing/Rough-in3/20/20013/20/20013/20/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/20/2001 at 07:42:13. Contact: ###-####. center area, seal/ fireblock; add straps; engr to chk holes at joists 3/20/2001 6:03:39 PM
BLD00-02242 BLD-Framing/Rough-in3/20/20013/20/20013/20/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/20/2001 at 08:18:33. Contact: ###-####...ok to cover west end corridor 3/20/2001 6:00:36 PM
BLD00-02318 BLD-Final3/20/20013/20/20013/20/2001 12:00:00 AMPPART
Harry ###-####, final ok this portion,( w/ BLD00-00758... has struct c/n on seismic, need report) 3/20/2001 4:18:35 PM
BLD00-00758 BLD-Final3/20/20013/20/20013/20/2001 12:00:00 AMPFAIL
Harry ###-####; keep c/n need stamped eng'r's observation; fix rear door threshhold...too high 3/20/2001 4:15:00 PM 3/20/2001 4:16:25 PM