BLD00-03185
| BLD-Concrete | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 07:28:15. Contact: ###-####.
masonary, pending S.I. report 3/20/2001 1:05:50 PM
|
BLD00-01496
| BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | FAIL |
|
|
###-####
truss bracing, straps, fire blocking, etc. 3/20/2001 4:31:34 PM
|
BLD01-00195
| BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | PART |
|
|
shear panel Travis ###-####
c/n re-nail flush, ok to side after 3/20/2001 4:52:45 PM
|
BLD00-03236
| BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 12:00:00 AM | P | FAIL |
|
|
SHEAR\\###-####
c/n posted, need letter from eng. for compliance for shear due to changes (as built vs. plans) 3/20/2001 3:28:03 PM
|