Inspections for the day of: Tuesday, March 20, 2001.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00219 BLD-Foundation3/19/20013/20/20013/20/2001 12:00:00 AMPPASS
clint ###-#### after beep 14236
BLD01-00557 BLD-Footing3/20/20013/20/20013/20/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/20/2001 at 08:28:50. Contact: ###-####. No one on site. 3/20/2001 3:20:22 PM
BLD00-03091 BLD-Framing/Rough-in3/20/20013/20/20013/20/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/20/2001 at 08:48:23. Contact: ###-####.c/n posted-ok to insulate. 3/20/2001 3:59:00 PM
BLD01-00136 BLD-Framing/Rough-in3/20/20013/20/20013/20/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/20/2001 at 09:11:52. Contact: ###-####.cn posted-straps of beam at b.room # 2 needed-ok to insulate 3/20/2001 3:11:36 PM
BLD01-00018 BLD-Framing/Rough-in3/20/20013/20/20013/20/2001 12:00:00 AMPFAIL
###-#### c/n posted-additional nailing and mst straps per plans needed, interior shear inspection needed prior to mud and tape 3/20/2001 2:16:13 PM
BLD00-03120 BLD-Final3/20/20013/20/20013/20/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/20/2001 at 10:53:54. Contact: ###-####. C. of C. # 20232 3/20/2001 2:45:37 PM
BLD00-03705 BLD-Energy code compliance3/20/20013/20/20013/20/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/20/2001 at 11:20:14. Contact: ###-####.