FIR03-00059
| INSP-Final Inspection | 3/19/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/19/2003 at 9:48:48 AM. Contact: ###-####. sprinkler system requires annual inspection; duct detectors not installed in straight piece of duct; tested for troubles; alarms; sprinkler tampers and flow okay 3/20/2003 4:12:19 PM
|
FIR03-00016
| INSP-Alarm Testing | 3/19/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/19/2003 at 11:30:48 AM. Contact: ###-####. duct detectors powered by panel; need calc's and it appears larger amp batteries will be needed; need to test sprinkler controls/flow 3/20/2003 10:37:28 AM
|
BLD02-02924
| FIRE-Final Inspection | 3/19/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | A | FAIL |
|
|
###-#### can do fire alarm inspection for Mountain Alarm at the same time awaiting alarm final; exit/emergency lights okay; need sprinkler canopy and test controls/flow with alarms 3/20/2003 10:38:42 AM
|
BLD02-03016
| FIRE-Final Inspection | 3/19/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | A | PART |
|
|
JEREMY; Phone #: ###-#### Internet Inspection Request from: Annette Moore per Dave Miller/Troy temp is approved pending fire alarm permit approval/testing; a new full height partition is installed creating new conference room which has overspaced sprinkler at 11 foot from new partition 3/20/2003 8:17:43 AM
|
FIR02-00385
| INSP-Sprinkler Rough-in/Hydro | 3/19/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | A | PART |
|
|
RUSS; Phone #: ###-#### Internet Inspection Request from: Annette Moore hydro okay on all piping in pump room 3/20/2003 11:09:56 AM
|
BLD02-03101
| FIRE-Final Inspection | 3/19/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | A | PART |
|
|
###-#### - ok for temp. occ. only
|
BLD02-01533
| FIRE-Final Inspection | 3/20/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | A | PART |
|
|
temp occ approved pending standpipe interconnection; alarm tampers/flow of pump
|
BLD02-01413
| FIRE-Final Inspection | 3/20/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | P | PART |
|
|
temp occ aprroved per agreementletter to interconnect standpipes and monitor tampers in basement
|
FIR03-00110
| INSP-Conference | 3/19/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/19/2003 at 4:57:26 PM. Contact: ###-####. partial stub out okay 3/20/2003 4:12:49 PM
|
FIR02-00473
| INSP-Sprinkler Rough-in/Hydro | 3/20/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | P | PART |
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs hydro on overhead okay 3/20/2003 4:13:14 PM
|
BLD03-00260
| FIRE-Final Inspection | 3/20/2003 | 3/20/2003 | 3/20/2003 12:00:00 AM | P | PASS |
|
|
CARLA ###-#### FOR BEAUTY all items from previous inspection corrected 3/20/2003 4:33:26 PM
|