BLD07-02841
| BLD-Footing | 3/20/2008 | 3/20/2008 | 3/21/2008 11:25:16 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/19/2008 at 3:33:57 PM. Contact: ###-####. bridge ftg ok
|
BLD06-01451
| BLD-Conference | 3/20/2008 | 3/20/2008 | 3/20/2008 3:57:27 PM | P | PART |
|
|
Dave; Could you drop by about 2:30-3:00 and take a look at 1st layer of drywall at stairway walls.The drywall forman and framing ok to add second layereforman would like to be there. Let me know if this time is not good.Thanks. Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD07-01910
| BLD-Concrete | 3/20/2008 | 3/20/2008 | 3/20/2008 3:56:16 PM | P | PART |
|
|
russ - pouring at 2:00 Phone #: ###-####
|
BLD08-00443
| BLD-Foundation | 3/20/2008 | 3/20/2008 | 3/20/2008 3:55:40 PM | P | PART |
|
|
sabastian Phone #: ###-####
|
BLD08-00043
| BLD-Framing/Rough-in | 3/19/2008 | 3/20/2008 | 3/20/2008 3:55:17 PM | A | PASS |
|
|
mario Phone #: ###-####
|
BLD07-02434
| BLD-Final | 3/20/2008 | 3/20/2008 | 3/20/2008 1:27:23 PM | P | FAIL |
|
|
bill Phone #: ###-#### everything ok but the permit is or a unfinished basement and the basement is finished need to change permit to show a finished basement
|
BLD07-02841
| BLD-Footing | 3/19/2008 | 3/20/2008 | 3/20/2008 11:01:33 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/19/2008 at 3:33:57 PM. Contact: ###-####. boat dock south end ok to pour
|
BLD07-01318
| BLD-Framing/Rough-in | 3/19/2008 | 3/20/2008 | 3/20/2008 9:38:07 AM | A | PART |
|
|
Doc Phone #: ###-#### ceiling grid ok to cover
|
BLD07-03027
| BLD-Energy code compliance | 3/19/2008 | 3/20/2008 | 3/20/2008 8:47:54 AM | A | PASS |
|
|
Phone #: ###-#### ok to cover ext walls
|
MIS07-00226
| MIS-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/20/2008 8:15:50 AM | | PART |
|
|
sent this to Bob A he has been covring this project
|