Inspections for the day of: Thursday, March 20, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00316 FIRE-Final Inspection3/20/20083/20/20083/21/2008 3:33:45 PMPPASS
life safety passed
FIR07-00697 INSP-Sprinkler Rough-in3/19/20083/20/20083/20/2008 4:27:52 PMPCANC
Inspection was scheduled for the afternoon but due to previous commitments at micron I could not due the inspection in the afternoon. I offered to due perform the inspection in the morning but Mike Meyers had other commitments in Middleton. Mike and I agreed to meet at 8:30 friday morning.
FIR07-00909 INSP-Sprinkler Rough-in3/19/20083/20/20083/20/2008 4:17:01 PMPPASS
See the city approved plans for the two rooms where the sprinkler piping is ok to cover. I found one pendant head spaced too far from a wall in one of these two rooms. The fitter started correcting this prior to my leaving. The earthquake bracing. Also the last earthquake brace is missing from the below mezzanine piping. Prior to ceilings being installed below the mezzanine another rough-in inspection for armovers/hangers will be required. None of the overhead piping for the main fire sprinkler system was inspected. Per the fitter several heads are being added due to a large beam and a wall around the stairs. The added heads at the beam appear to end up in one of the remote areas. The plans will need to be resubmitted for verification of additional heads flowing water in the remote area. I notified the fitter of this.
FIR08-00085 INSP-Final Inspection3/20/20083/20/20083/20/2008 12:25:09 PMPPASS
permit passed
BLD06-02528 FIRE-Final Inspection3/19/20083/20/20083/20/2008 12:24:29 PMPPASS
life safety passed
FIR08-00070 INSP-Final Inspection3/20/20083/20/20083/20/2008 12:23:45 PMPPASS
permit finaled
FIR07-00578 INSP-Sprinkler Rough-in/Hydro3/19/20083/20/20083/20/2008 12:02:42 PMAPASS
Hydro test passed. Need certification on the new backflow and inspection tag on the anti-freeze system riser. The fire proofing has not been repiared yet.
FIR07-01043 INSP-Sprinkler Rough-in/Hydro3/19/20083/20/20083/20/2008 6:25:49 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Diane Turner Inspection cancelled from web by: Diane Turner
FIR07-01043 INSP-Final Inspection3/20/20083/20/20083/20/2008 12:00:00 AMPCANC
Panel is not clear and has a supervisory for a low air do to a compressor that has malfunctioned. Brett Anderson of Mountain Alarm was notified that the issue will have to be resolved before fire alarm permit is finaled.