Inspections for the day of: Tuesday, March 20, 2012.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00575 INSP-Alarm Testing3/20/20123/20/20123/21/2012 4:33:13 PMPPART
Duct system control valve descriptor and tamper switch at the yard PIV have been provided.
BLD11-02317 FIRE-Conference3/19/20123/20/20123/21/2012 4:25:56 PMADONE
On site conference with contractor regarding building modifications at the basement level storage/lab room 2-005, engineering office 2-006, and the trash/locker room. Relocated doors, new walls and infill will require modifications to the existing fire alarm system to maintain coverage where provided.
FIR12-00124 INSP-Final Inspection3/20/20123/20/20123/21/2012 4:18:42 PMPPASS
Inspection passed. Fire alarm permit finaled.
FIR12-00141 INSP-Sprinkler Rough-in3/20/20123/20/20123/21/2012 4:17:44 PMPPART
Scope of modifications are approved for ceiling cover.
FIR12-00103 INSP-Final Inspection3/19/20123/20/20123/21/2012 4:16:30 PMPFAIL
Voice evacuation message does not meet intelligibility criteria. Ref. NFPA 72 2010 annex D.
BLD11-01160 FIRE-Final Inspection3/19/20123/20/20123/21/2012 10:30:14 AMPPASS
Fire life safety per the scope of permit work passed inspection.
FIR12-00119 INSP-Final Inspection3/16/20123/20/20123/20/2012 12:25:35 PMAPART
Functional testing and offsite monitoring verified. Items noted include a non-restored supervisory signal on loop 2 and a netcon 6 rating.