FIR11-00575
| INSP-Alarm Testing | 3/20/2012 | 3/20/2012 | 3/21/2012 4:33:13 PM | P | PART |
|
|
Duct system control valve descriptor and tamper switch at the yard PIV have been provided.
|
BLD11-02317
| FIRE-Conference | 3/19/2012 | 3/20/2012 | 3/21/2012 4:25:56 PM | A | DONE |
|
|
On site conference with contractor regarding building modifications at the basement level storage/lab room 2-005, engineering office 2-006, and the trash/locker room. Relocated doors, new walls and infill will require modifications to the existing fire alarm system to maintain coverage where provided.
|
FIR12-00124
| INSP-Final Inspection | 3/20/2012 | 3/20/2012 | 3/21/2012 4:18:42 PM | P | PASS |
|
|
Inspection passed. Fire alarm permit finaled.
|
FIR12-00141
| INSP-Sprinkler Rough-in | 3/20/2012 | 3/20/2012 | 3/21/2012 4:17:44 PM | P | PART |
|
|
Scope of modifications are approved for ceiling cover.
|
FIR12-00103
| INSP-Final Inspection | 3/19/2012 | 3/20/2012 | 3/21/2012 4:16:30 PM | P | FAIL |
|
|
Voice evacuation message does not meet intelligibility criteria. Ref. NFPA 72 2010 annex D.
|
BLD11-01160
| FIRE-Final Inspection | 3/19/2012 | 3/20/2012 | 3/21/2012 10:30:14 AM | P | PASS |
|
|
Fire life safety per the scope of permit work passed inspection.
|
FIR12-00119
| INSP-Final Inspection | 3/16/2012 | 3/20/2012 | 3/20/2012 12:25:35 PM | A | PART |
|
|
Functional testing and offsite monitoring verified. Items noted include a non-restored supervisory signal on loop 2 and a netcon 6 rating.
|