Inspections for the day of: Tuesday, March 20, 2012.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDoug A Poedy
TitleELE-INSPECTOR
Phone #447-7209
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-00370 Final3/20/20123/20/20123/20/2012 5:06:00 PMPPASS
Equipment supplied with electrical energy shall be listed and labeled. After inspection noted that all parts of cooler with electrical energy supplied are listed. Components( as in cooler panels) with no electrical energy are not. As AHJ, I approve this assembly as being safe for operation as per NEC 110.2 and 110.3A
ELE12-00565 Temporary Service3/20/20123/20/20123/20/2012 12:27:34 PMPPASS
T/S Connect ok.
GCE12-00038 GCE-Final3/20/20123/20/20123/20/2012 11:54:08 AMPPASS
brent Phone #: ###-####