BLD13-00181
| FIRE-Conference | 3/19/2014 | 3/19/2014 | | P | |
|
|
JC at phone #: ###-####
|
FIR13-00440
| INSP-Sprinkler Rough-in | 3/20/2014 | 3/20/2014 | 3/20/2014 5:12:26 PM | P | PART |
|
|
Verified coverage per plan mod #2 sheet FP0.1 - upright protection at the crawl space below 1st floor. 1st floor reception, west elevator lobby, mens and womens restrooms, and mail room ceilings approved for cover, marked on plans with todays date.
|
FIR13-00579
| INSP-Sprinkler Rough-in | 3/20/2014 | 3/20/2014 | 3/20/2014 5:00:27 PM | P | PART |
|
|
Okay to cover overhead work at the 3rd floor mens and womens restrooms.
|
FIR13-00703
| INSP-Final Inspection | 3/20/2014 | 3/20/2014 | 3/20/2014 4:58:27 PM | P | PASS |
|
|
Field inspection passed. Fire alarm permit finaled.
|
BLD13-00395
| FIRE-Final Inspection | 3/18/2014 | 3/20/2014 | 3/20/2014 11:05:24 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR13-00670
| INSP-Final Inspection | 3/19/2014 | 3/20/2014 | 3/20/2014 10:50:28 AM | A | PASS |
|
|
Final walkthrough completed. Fire sprinkler permit finaled.
|
BLD13-00819
| FIRE-Final Inspection | 3/19/2014 | 3/20/2014 | 3/20/2014 10:48:29 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD14-00408
| FIRE-Final Inspection | 3/19/2014 | 3/20/2014 | 3/20/2014 10:47:12 AM | A | FAIL |
|
|
Scope of work incomplete, remodel work will require modifications to the existing fire sprinkler system.
|