Inspections for the day of: Friday, March 20, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-02817 FIRE-Conference3/20/20153/20/20153/31/2015 12:03:10 PMPDONE
Project related fire sprinkler permit work finaled. Need to repair door closure at the brewery room west side. Informed tenant to provide a permanent power source to attic fans above the kitchen coolers- extension cords not allowed.
FIR14-00778 INSP-Sprinkler Rough-in3/19/20153/20/20153/20/2015 7:12:11 PMAFAIL
Area G dry system install does not correlate with approved plan set regarding main routing.
FIR14-00708 INSP-Sprinkler Rough-in3/19/20153/20/20153/20/2015 7:09:23 PMAPART
Overhead inspection for the 3rd floor area G wet system at living units only, including tenting, okayed per as-built plans matching install with the exception of two balconies now covered by dry system.
FIR14-00815 INSP-Sprinkler Rough-in3/19/20153/20/20153/20/2015 3:30:47 PMAPART
Rough-in inspection at living units 2nd floor area 3- sheets FP11 and FP9 completed. Need to relocate one blocked sprinkler at unit 227. Remainder okayed, refer to dated annotations.
FIR14-00783 INSP-Sprinkler Rough-in3/19/20153/20/20153/20/2015 3:28:09 PMAPART
Inspection for thrust blocking completed satisfactory- okay to cover at areas installed to date.
FIR14-00712 INSP-Final Inspection3/20/20153/20/20153/20/2015 3:25:39 PMPPASS
UG fire supply line flush and final completed. Permit final approved.
FIR15-00068 INSP-Final Inspection3/18/20153/20/20153/20/2015 11:52:49 AMAPART
Completed inspection of the new system addition per approved plans. Items noted include; missing seismic brace, spacing at uprights above the kitchen coolers needs adjustment, missing door closure at the west side of the brewery to meet conditions necessary for use of the room design method as indicated, existing system riser is overdue annual inspection.
FIR15-00162 INSP-Final Inspection3/19/20153/20/20153/20/2015 11:45:11 AMAPASS
Scope of work completed. Inspection passed, permit finaled.
FIR14-00876 INSP-Final Inspection3/18/20153/20/20153/20/2015 11:43:52 AMAPASS
UG fire supply line flush completed. Overhead system charged and flow tested. Verified dry upright at the attic, final walkthrough finished. Permit finaled.