FIR15-00134
| INSP-Sprinkler Rough-in | 3/20/2015 | 3/20/2015 | 3/20/2015 3:32:51 PM | P | PASS |
|
|
Life safety passed
|
BLD15-00427
| FIRE-Final Inspection | 3/19/2015 | 3/20/2015 | 3/20/2015 2:52:05 PM | P | PASS |
|
|
Life safety passed
|
BLD15-00438
| FIRE-Final Inspection | 3/19/2015 | 3/20/2015 | 3/20/2015 1:16:33 PM | A | PASS |
|
|
Life safety passed
|
FIR15-00155
| INSP-Sprinkler Rough-in/Hydro | 3/19/2015 | 3/20/2015 | 3/20/2015 1:16:15 PM | A | PASS |
|
|
Permit finaled
|
FIR14-00947
| INSP-Final Inspection | 3/19/2015 | 3/20/2015 | 3/20/2015 9:41:45 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00621
| INSP-Sprinkler Rough-in | 3/19/2015 | 3/20/2015 | 3/20/2015 9:12:04 AM | A | PASS |
|
|
Rough-in passed. Piping can not be covered until a tenting inspection has been passed.
|
FIR14-00623
| INSP-Sprinkler Rough-in | 3/19/2015 | 3/20/2015 | 3/20/2015 9:11:25 AM | A | PASS |
|
|
Tenting passed. Piping can be covered.
|
FIR14-00722
| INSP-Alarm Testing | 3/20/2015 | 3/20/2015 | 3/20/2015 8:23:18 AM | A | DONE |
|
|
Was only able to verify monitoring (phone lines) and supervision of the 4009 NAC panel. No one could verify the the hvac units are functional and the sprinkler contractor was not available.
|
FIR15-00044
| INSP-Final Inspection | 3/20/2015 | 3/20/2015 | 3/20/2015 8:21:31 AM | A | PASS |
|
|
Permit finaled
|