PLM16-00903
| PLM-Aging Inspection | 3/20/2017 | 3/20/2017 | 3/27/2017 3:14:11 PM | | PASS |
|
|
|
PLM16-03095
| PLM-Aging Inspection | 3/20/2017 | 3/20/2017 | 3/22/2017 11:07:03 AM | | PEND |
|
|
tagged
|
PLM16-00032
| PLM-Aging Inspection | 3/20/2017 | 3/20/2017 | 3/21/2017 3:49:44 PM | | PASS |
|
|
|
PLM17-00787
| Final | 3/20/2017 | 3/20/2017 | 3/20/2017 4:21:41 PM | P | PEND |
|
|
Contact Jason with any questions. Phone #: ###-#### Inspection requested via web by Justin Whitt. Run T&P drain to within 6" of the floor. Verifiy gas pipe size and pressure test.
|
PLM17-00808
| Groundwork | 3/20/2017 | 3/20/2017 | 3/20/2017 3:51:50 PM | P | PART |
|
|
Underground and rough in are completeDoor should be unlocked, if not call me for door code Thanks Phone #: ###-#### Inspection requested via web by MICHAEL BYERS. Add water hammer arrester for the flush valves. ISPC 609.10. DWV ok to cover
|
PLM17-00781
| Water Heater Final | 3/17/2017 | 3/20/2017 | 3/20/2017 3:45:58 PM | P | CANC |
|
|
Mr. Hancock has dialysis before 1 pm and after 3 pm. Please call him prior to arrival at ###-####. Phone #: ###-#### >> Inspection requested via web by Maira Guzman Inspection cancelled from web by: Maira Guzman
|
PLM16-03491
| Water and/or Sewer | 3/20/2017 | 3/20/2017 | 3/20/2017 3:10:16 PM | P | PASS |
|
|
|
PLM16-03491
| DOC - Permit Finaled | 3/20/2017 | 3/20/2017 | 3/20/2017 3:10:04 PM | P | PASS |
|
|
|
PLM16-04112
| Plumbing Rough-in | 3/20/2017 | 3/20/2017 | 3/20/2017 2:21:45 PM | P | FAIL |
|
|
Inspection requested via web by Brian Johansen. North end dwv test failed.
|
PLM17-00779
| Water Heater Final | 3/18/2017 | 3/20/2017 | 3/20/2017 1:37:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Paul Lawson
|
PLM17-00779
| Water Heater Final | 3/17/2017 | 3/20/2017 | 3/20/2017 11:36:26 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Paul Lawson
|
PLM17-00797
| Plumbing Rough-in | 3/19/2017 | 3/20/2017 | 3/20/2017 11:36:11 AM | A | FAIL |
|
|
Lock box code 4810. Filled waste ; vent with water and water is on under pressure. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy. Drain line at the kitchen sink cleanout is not glued and pipes don't line up. Make corrections and call for a reinspection
|
PLM17-00708
| Final | 3/16/2017 | 3/20/2017 | 3/20/2017 11:09:57 AM | A | PASS |
|
|
Late AM, but before Noon. Please call Todd to schedule time ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM17-00740
| Water Heater Final | 3/17/2017 | 3/20/2017 | 3/20/2017 10:56:12 AM | A | PASS |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria
|
PLM17-00794
| Water Heater Final | 3/17/2017 | 3/20/2017 | 3/20/2017 10:10:42 AM | A | PASS |
|
|
STORE OPENS AT 8AM. Phone #: ###-#### Inspection requested via web by ron pierce
|
PLM17-00749
| Water Heater Final | 3/15/2017 | 3/20/2017 | 3/20/2017 9:22:45 AM | A | PASS |
|
|
Please call homeowner --Chris ###-#### when en route Phone #: ###-#### Inspection requested via web by Erin Whiting
|
PLM17-00782
| Water Heater Final | 3/17/2017 | 3/20/2017 | 3/20/2017 9:01:25 AM | A | PASS |
|
|
PLEASE CALL TOM WHEN YOU ARE ON YOUR WAY. THANK YOU! Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM16-04060
| Plumbing Rough-in | 3/20/2017 | 3/20/2017 | 3/20/2017 7:30:16 AM | P | CANC |
|
|
>> Inspection requested via web by Brian Johansen Inspection cancelled from web by: Brian Johansen
|