Inspections for the day of: Tuesday, March 20, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00097 BLD-Conference3/20/20183/20/20183/21/2018 10:41:12 AMPDONE
Possible roof being done without permit
BLD18-00001 BLD-Framing/Rough-in3/20/20183/20/20183/20/2018 4:52:02 PMPPASS
Greg Phone #: ###-####
BLD18-00001 BLD-Conference3/19/20183/20/20183/20/2018 4:51:41 PMPDONE
Greg Phone #: ###-####
BLD17-01767 BLD-Framing/Rough-in3/20/20183/20/20183/20/2018 4:51:21 PMPPART
Partial Area C Phone #: ###-#### Inspection requested via web by Josh Strasser
Area C OK.
BLD18-00628 BLD-Framing/Rough-in3/20/20183/20/20183/20/2018 4:50:43 PMPPART
zach Phone #: ###-####
Gave OK to cover select walls. Need trade rough ins.
BLD17-02921 BLD-Framing/Rough-in3/19/20183/20/20183/20/2018 12:02:39 PMAPASS
Jason Phone #: ###-####
BLD18-00767 BLD-Final3/19/20183/20/20183/20/2018 11:40:50 AMAPASS
Phone #: ###-#### Inspection requested via web by Sandra Daffer
BLD18-00767 DOC - Permit Finaled3/20/20183/20/20183/20/2018 11:40:35 AMPPASS
BLD18-00867 BLD-Final3/13/20183/20/20183/20/2018 11:40:18 AMAPASS
Walter Phone #: ###-####
BLD18-00867 DOC - Permit Finaled3/20/20183/20/20183/20/2018 11:39:57 AMPPASS
MIS18-00037 BLD-Conference2/22/20183/20/20183/20/2018 11:33:01 AMADONE
Check back with Jessica.... Fuel up nutrition.
In the process........
MIS18-00076 BLD-Conference3/19/20183/20/20183/20/2018 10:42:32 AMAPASS
HCD insp for CO and Smoke det //call Jessica 30 min before ###-####
MIS18-00076 DOC - Permit Finaled3/20/20183/20/20183/20/2018 10:42:19 AMPPASS
Smoke det and CO2 det ........OK.