Inspections for the day of: Tuesday, March 20, 2018.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03338 BLD-Aging Inspection3/20/20183/20/20183/20/2018 4:37:41 PM PASS
Foundation work completed. Will final when project is completed.
BLD17-00340 BLD-Aging Inspection3/20/20183/20/20183/20/2018 4:36:55 PM PASS
MIS17-00389 MIS-Aging Inspection3/20/20183/20/20183/20/2018 4:35:23 PM DONE
MIS17-00389 DOC - Permit Finaled3/20/20183/20/20183/20/2018 4:35:16 PMPPASS
plumbing permit issued and finaled.
MIS17-00197 MIS-Aging Inspection3/20/20183/20/20183/20/2018 4:32:50 PM DEFR
BLD17-03994 BLD-Final3/19/20183/20/20183/20/2018 4:32:14 PMPNR
late as poss // Tommy Lyles Phone #: ###-####. Fire/life/safety final failed. Needs electrical and fire sprinkler finals. Will also need demo permit finaled as well.
ESC17-00102 General Inspection3/20/20183/20/20183/20/2018 4:07:34 PMPFAIL
Needs to sweep all silts from hard surfaces. Appeares no maintenace has been taken place. Noted excessive trackout. All Either no BMP's in place, or the ones in place are in non functioning state.
BLD17-02429 BLD-Framing/Rough-in3/19/20183/20/20183/20/2018 3:34:51 PMPFAIL
Phone #: ###-#### Inspection requested via web by David Scaggs. Complete lateral bracing, reapir firewall, install missed header.
BLD17-03755 BLD-Ceiling Grid Inspection3/19/20183/20/20183/20/2018 2:35:59 PMPPASS
Please contact JP at ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero.
BLD17-03581 BLD-Other3/20/20183/20/20183/20/2018 2:22:46 PMPDONE
roof shear // Adam Joslin Phone #: ###-####
BLD16-04486 BLD-Other3/20/20183/20/20183/20/2018 2:04:24 PMPPASS
Fire rated assembly at roof eaves. Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-00116 BLD-Framing/Rough-in3/19/20183/20/20183/20/2018 2:00:53 PMPFAIL
Phone #: ###-#### Inspection requested via web by Philip Yates. Complete lateral bracing on A02, A03 and A04 trusses. Nail 2ply BG01 box truss per the engineering. Roll block floor joist at cantilevers. Provide 2x6 blocking under either end of BGO1 truss to complte load path. Install the additional SDS screws on ledgers. ok to insulate. Correction notice posted.
BLD18-00432 BLD-Framing/Rough-in3/20/20183/20/20183/20/2018 11:26:59 AMAPART
Interior steel stud framed wall ok. Noted that an existing door/sidelight has been removed from the existing alcove and reinstalled in new interior wall. Side light is wired glass and no longer complies as tempered glazing. Glazing will need to removed and replaced with tempered glazing prior to final.
BLD17-03716 BLD-Framing/Rough-in3/19/20183/20/20183/20/2018 9:34:31 AMAPASS
call ahead 15 mins------Jim Phone #: ###-####
BLD18-00207 BLD-Energy code compliance3/19/20183/20/20183/20/2018 8:46:03 AMAPASS
Phone #: ###-#### Inspection requested via web by Philip Yates
BLD17-01641 BLD-Footing3/19/20183/20/20183/20/2018 8:45:47 AMAPASS
jose Phone #: ###-####
BLD18-00432 BLD-Framing/Rough-in3/19/20183/20/20183/20/2018 12:00:00 AMACANC
Keith Lemons Phone #: ###-####