FIR18-00545
| INSP-Supply line flush | 3/18/2019 | 3/20/2019 | 3/20/2019 2:58:45 PM | P | PASS |
|
|
Underground flush witnessed by Mark Scharfen on 3/22/2019-building D was witnessed by Troy Cobbley and Mark Scharfen but wrong permit was signed off.
Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00562
| INSP-Supply line flush | 3/18/2019 | 3/20/2019 | 3/20/2019 2:57:53 PM | P | PASS |
|
|
underground flush witnessed.
Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-04066
| FIRE-Final Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 2:56:04 PM | P | PART |
|
|
A temporary for life safety is being given until the deadbolt has been removed from the west exit door and approved hardware provided.
|
BLD18-04501
| FIRE-Final Inspection | 3/19/2019 | 3/20/2019 | 3/20/2019 2:18:26 PM | P | PASS |
|
|
Life safety passed pending the installation of the CO detector. Inspection by Mark Scharfen.
Keith Phone #: ###-####
|
FIR18-00804
| INSP-Sprinkler Rough-in/Hydro | 3/20/2019 | 3/20/2019 | 3/20/2019 1:32:31 PM | P | CANC |
|
|
To be rescheduled for tomorrow. This Rough-in/Hydro is for wings A ; B. The contact is Richard Clark. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00510
| INSP-Sprinkler Rough-in | 3/19/2019 | 3/20/2019 | 3/20/2019 1:32:03 PM | P | PASS |
|
|
Piping above soffits in units 209, 211, 212, 213, 214, 215 and Corridor 2 is ok for cover.
Rough in for second floor Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00675
| INSP-Final Inspection | 3/19/2019 | 3/20/2019 | 3/20/2019 1:30:55 PM | A | CANC |
|
|
To be rescheduled for tomorrow. Robert Phone #: ###-####
|
FIR18-00675
| INSP-Sprinkler Rough-in/Hydro | 3/19/2019 | 3/20/2019 | 3/20/2019 1:30:32 PM | A | PASS |
|
|
Overhead hydro test passed for the phase 1 area. Need to add sprinkler coverage in Display/Trophy case as discussed. Need plan modes for additional 90's for the remote area under the mezzanine.
Robert Phone #: ###-####
|
FIR19-00185
| INSP-Final Inspection | 3/19/2019 | 3/20/2019 | 3/20/2019 9:53:50 AM | P | PASS |
|
|
Permit finaled
Please call Payden for access Phone #: ###-####
|
FIR19-00185
| INSP-Sprinkler Rough-in | 3/19/2019 | 3/20/2019 | 3/20/2019 9:53:10 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered. Please call Payden for access-Phone #: ###-####
|
BLD19-00790
| FIRE-Final Inspection | 3/19/2019 | 3/20/2019 | 3/20/2019 9:35:05 AM | A | PASS |
|
|
Conducted life safety inspection. Exit lights/Emergency lighting fire extinguishers and occupant load sign passed. Per discussion with owner CO system for taps will only have 1 50 lb tank that will be removed prior to building final.
mark scharfen Joe Phone #: ###-####
|