ESC18-01525
| Complaint Inspection | 3/18/2019 | 3/18/2019 | | P | |
|
|
|
ESC18-00020
| General Inspection | 3/19/2019 | 3/20/2019 | 3/26/2019 10:40:46 PM | P | PART |
|
|
Subdivsion BMPs installed. Housekeeping, maintenance, vegetation establishment, and erosion controls on slopes are mostly working except for in a few specific areas.
Corrections needed: - need to address erosion occuring at the end of the rock drain at the bottom of Trapper. Previously discussed and postponed to prevent damage from equipment. Solution pending. Suggest slope drain on steep portions of the drainage. - need to address large rill on slope above Trapper. Water is concentrating along the top of the cut slope and flowing down the rill. Need to install slope drain or build berm to disperse flow. - Need to pick up all loose trash along subdivision, in particular along Barber Drive - Lot 8 block 2 has erosion and sediment runoff occuring. This needs to be addressed with perimeter wattles. Receiving storm drain sediment bag needs changed out.
Corrections emailed to Hunter Homes and Syman.
|
ESC18-01615
| General Inspection | 3/20/2019 | 3/20/2019 | 3/26/2019 4:40:03 PM | P | PASS |
|
|
Demo complete. No trackout. No stabilization, Call into RP regarding next phase of construction on this parcel. Looks like an infill sub.
|
ESC18-01197
| BMP Violation | 3/20/2019 | 3/20/2019 | 3/21/2019 1:24:08 PM | P | FAIL |
|
|
Pick up trash pile in the backyard. Clean up sidewalk and gutter
Verbal request to jared with Riverwood.
follow up scheduled.
|
ESC17-01360
| Conference | 3/19/2019 | 3/20/2019 | 3/21/2019 12:54:47 PM | A | PEND |
|
|
NOV to be sent to developer, ESC RP, and all homebuilders for
trash control sweeping limits of disturbance violations
|
ESC18-01228
| BMP Violation | 3/20/2019 | 3/20/2019 | 3/21/2019 12:48:54 PM | P | FAIL |
|
|
Verbal correction request to RP Adam:
- pick up trash behind home - address runoff from lot causing erosion of the back bank - dumped dirt may need removal add/or restoration-reseeding of the area.
- prohibit any access to area outside of subdivsion fencing.
|
ESC18-01515
| Conference | 3/20/2019 | 3/20/2019 | 3/20/2019 3:44:42 PM | P | FAIL |
|
|
Multiple violations at site. Unable to meet contractor RP at site. See corrections listed in previous inspection.
|
ESC18-01497
| Conference | 3/20/2019 | 3/20/2019 | 3/20/2019 3:43:23 PM | P | FAIL |
|
|
3rd correction request and failed inspection.
Corrections needed: - sweep all loose dirt off sidewalk, gutter, and street - pick up any loose trash around site that can be blown away - install sediment protection filter bag on Cassia, west of site across Hilton - repost ESC permit signs in front of each project on a sign board. - site must be equipped with push broom for daily sweep up by RP and/or subcontractors.
If all corrections are not complete Monday 3/25 re-inspection fees and pacel holds will be applied to all projects
|
ESC18-00626
| General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 1:56:28 PM | | CANC |
|
|
rescheduled for site final
|
ESC18-00629
| General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 1:55:55 PM | | CANC |
|
|
|
ESC15-00857
| General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 1:42:53 PM | | CANC |
|
|
|
MIS19-00074
| ESC-Conference | 3/20/2019 | 3/20/2019 | 3/20/2019 1:09:48 PM | P | PEND |
|
|
Andy- Trash on lot 825 S. Hilton St.
Large pile of trash from demolition of structures and/or dumping from neighborhood.
Contacted lot owner and future SFH builder Todd Campbell Construction.
|
ESC18-00450
| Aging Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 12:58:34 PM | | CANC |
|
|
|
ESC18-00238
| Aging Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 12:57:01 PM | | CANC |
|
|
|
ESC18-01134
| General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 12:15:24 PM | P | FAIL |
|
|
Access to desert for landscaping work. Dumping in desert area. Fence section removed.
Investigation in progress.
|
ESC18-01782
| BMP Violation | 3/20/2019 | 3/20/2019 | 3/20/2019 11:32:42 AM | P | FAIL |
|
|
Washout never cleaned. Needs general housekeeping and trash pickup
|
ESC18-01286
| Site Preparation | 3/20/2019 | 3/20/2019 | 3/20/2019 10:39:31 AM | A | PASS |
|
|
Site meeting with project manager Kurt. RP contacts are also Scott and Jill. Kurt also working on Aspen Valley.
-permit sign posted. - perimeter has sidewalk and landscaping already installed, site is below grade of surrounding areas. Just need to keep sidewalks clean, no stockpiling on sidewalk - correction request to do maintenance on construction entrance. Add angular or crushed 1.5"-3" rock - lined pit method of concrete washout will be used. - onsite stormwater swale is being installed. Will protect with wattles once complete
|
ESC18-00392
| General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 8:19:01 AM | | PART |
|
|
WIP on pool and landscaping. Front yard and driveway complete. Home is now occupied.
Corrections:
- pool shotcrete washout is not allowed to be dumped, potential that this site dumped on another site. Investigation in progress.
- rake out and compact area of erosion in the subdivsion flood drainage channel.
|
ESC18-00622
| General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 8:08:19 AM | | PASS |
|
|
Demo complete. New home in progress. See ESC18-00925
|
ESC18-00622
| DOC - Permit Finaled | 3/20/2019 | 3/20/2019 | 3/20/2019 8:07:37 AM | P | PASS |
|
|
|