ELE19-04678
| Rough-In Permanent Service | 3/20/2020 | 3/20/2020 | 3/20/2020 2:02:25 PM | P | FAIL |
|
|
Garage code 4224. Floor heat inspection in master bath Phone #: ###-#### Inspection requested via web by Troy Ballard 110.3 Splice between cold and hot leads to be burried in thin set, sensor required to be 24in from wall and centered between parallel heating leads
|
ELE20-00953
| Conference | 3/17/2020 | 3/20/2020 | 3/20/2020 2:00:16 PM | P | PASS |
|
|
Please give 30 min notice for travel. Phone #: ###-#### Inspection requested via web by Andy Gabiou Discussed connection of a 30A generator recep and breaker interlock.
|
ELE19-04505
| Electrical Rough-In | 3/20/2020 | 3/20/2020 | 3/20/2020 1:43:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud TV recep area's excluded from inspection. Remaining area ok walls only ok to cover
|
ELE20-00453
| Electrical Rough-In | 3/20/2020 | 3/20/2020 | 3/20/2020 1:08:56 PM | P | PASS |
|
|
Addition and entrance to is at back of house Phone #: ###-#### Inspection requested via web by steve sellers M. bed, bath, closet and living rm ok to cover
|
ELE20-00319
| Rough-In Permanent Service | 3/20/2020 | 3/20/2020 | 3/20/2020 12:40:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder rough in ok p/s u/g n ok
|
ELE19-01667
| Electrical Rough-In | 3/19/2020 | 3/20/2020 | 3/20/2020 11:02:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by mark mccullough rough in ok
|
ELE19-01667
| Permanent Service | 3/20/2020 | 3/20/2020 | 3/20/2020 11:02:34 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by mark mccullough p/s u/g n ok
|
ELE19-04111
| Final | 3/20/2020 | 3/20/2020 | 3/20/2020 10:18:30 AM | A | PASS |
|
|
garage code 4224 Phone #: ###-#### Inspection requested via web by Troy Ballard final ok
|
ELE20-00768
| Temporary Service | 3/19/2020 | 3/20/2020 | 3/20/2020 9:02:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE20-00769
| Temporary Service | 3/19/2020 | 3/20/2020 | 3/20/2020 9:02:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE19-01215
| Electrical Rough-In | 3/18/2020 | 3/20/2020 | 3/20/2020 8:54:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dru Nakaya Receps and switches were checked for final. GFCI breaker needed for Garage door and GFCI protection needed on recep facing garage on bathroom wall. Rough in ok.
|
ELE19-04505
| Electrical Rough-In | 3/18/2020 | 3/20/2020 | 3/20/2020 8:30:56 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud not ready re call
|
ELE19-04678
| Electrical Rough-In | 3/19/2020 | 3/20/2020 | 3/20/2020 5:58:02 AM | A | CANC |
|
|
Inspection for Master Bath floor heat Phone #: ###-#### >> Inspection requested via web by Troy Ballard Inspection cancelled from web by: Troy Ballard
|