BLD00-03519
| BLD-Footing | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PART |
|
|
###-#### placed with special insp. pending report. 3/21/2001 4:33:49 PM
|
BLD00-03697
| BLD-Framing/Rough-in | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | FAIL |
|
|
fr insp terry-- ###-#### c/n on site/ 3/21/2001 3:15:31 PM
|
BLD00-00746
| BLD-Final | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
###-#### call first \\sign off sheet in around back final ok please send l/c to contractor. 3/21/2001 5:08:59 PM
|
BLD00-03629
| BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 10:08:44. Contact: ###-####. to 420 3/21/2001 3:15:54 PM
|
BLD00-02180
| BLD-Final | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | CANC |
|
|
94 1-5200 to 420 3/21/2001 3:16:02 PM
|
BLD00-01563
| BLD-Concrete | 3/19/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 07:16:33. Contact: ###-####. placed with special insp. 3/21/2001 5:24:32 PM
|