MIS00-00136
| BLD-Final | 3/20/2001 | 3/21/2001 | 3/23/2001 12:00:00 AM | A | NR |
|
|
fn occ--###-####-network group-- ann-- walked job area...not specific as to which suite; need to verify operation of access controlled doors, corridor smoke det's; other items at rear stair enclosure, no panic hdwe. Spoke w/ tenant by phone, will contact owner to request reinsp...need fire , too. 3/22/2001 2:46:49 PM
|
BLD00-01631
| BLD-Conference | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/21/2001 10:54:27 AM w/ supt...repair of crack at north side..need eng's spec
|
BLD00-02581
| BLD-Conference | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/21/2001 10:21:40 AM w/ Dan Stuart re: resub for hvac, consulted Dave L.
|
BLD00-03634
| BLD-Conference | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/21/2001 12:12:33 PM w/ Pastor at site, removed urethane foam at lid; ok
|
BLD01-00162
| BLD-Conference | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/21/2001 2:53:42 PM reviewed soils reports, ok to place steel
|
BLD00-03337
| BLD-Conference | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/21/2001 3:52:25 PM w/ bldr re c/n; recall for insp.
|
BLD00-01649
| BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 3/21/2001 5:27:07 PM need submittal for mod's at elev. machine room; fasten edges of shaft wall mat'l at tracks (corners), reinsp
|
BLD00-02752
| BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 10:12:52. Contact: ###-####. 2nd c/n issued, ok to cover walls at cental areas pend other insps; need submittal for eifs, ok for holes at joists, etc; infill gaps at 1hr walls3/21/2001 2:32:53 PM 3/21/2001 2:34:23 PM
|