Inspections for the day of: Wednesday, March 21, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-00743 Sprinkler (Final)3/16/20013/21/20013/21/2001 12:00:00 AMANR
###-####
PLM00-03975 Plumbing Rough-in3/20/20013/21/20013/21/2001 12:00:00 AMAPART
bill-- ###-#### for a trim need to have approved access for pump on jetted tub through crawl. 3/21/2001 9:42:47 AM
PLM01-00783 Plumbing Rough-in3/20/20013/21/20013/21/2001 12:00:00 AMANR
jerimie ###-####
PLM01-00784 Water and/or Sewer3/20/20013/21/20013/21/2001 12:00:00 AMAPASS
swr & water ###-#### -page
PLM00-03546 Final3/20/20013/21/20013/21/2001 12:00:00 AMAPART
###-#### OKed temp. occupancy. power washer to be changed out as per conversation with general contractor. 3/21/2001 12:06:25 PM
PLM01-00787 Water and/or Sewer3/20/20013/21/20013/21/2001 12:00:00 AMANR
###-####
PLM00-02621 Final3/21/20013/21/20013/21/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/21/2001 at 09:48:10. Contact: ###-####. expansion tank to small need to be st-12 toilet and ped. lav needs to be sealed at floor in powder room. 3/21/2001 1:59:10 PM
PLM01-00783 Plumbing Rough-in3/21/20013/21/20013/21/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 3/21/2001 10:54:33 AM
PLM01-00787 Water and/or Sewer3/21/20013/21/20013/21/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 3/21/2001 10:51:51 AM
PLM01-00743 Sprinkler (Final)3/21/20013/21/20013/21/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 3/21/2001 11:14:00 AM after 2pm will be ready
PLM01-00304 Final3/21/20013/21/20013/21/2001 12:00:00 AMPPASS
###-####