PLM01-00743
| Sprinkler (Final) | 3/16/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | NR |
|
|
###-####
|
PLM00-03975
| Plumbing Rough-in | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PART |
|
|
bill-- ###-#### for a trim need to have approved access for pump on jetted tub through crawl. 3/21/2001 9:42:47 AM
|
PLM01-00783
| Plumbing Rough-in | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | NR |
|
|
jerimie ###-####
|
PLM01-00784
| Water and/or Sewer | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PASS |
|
|
swr & water ###-#### -page
|
PLM00-03546
| Final | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PART |
|
|
###-#### OKed temp. occupancy. power washer to be changed out as per conversation with general contractor. 3/21/2001 12:06:25 PM
|
PLM01-00787
| Water and/or Sewer | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | NR |
|
|
###-####
|
PLM00-02621
| Final | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 09:48:10. Contact: ###-####. expansion tank to small need to be st-12 toilet and ped. lav needs to be sealed at floor in powder room. 3/21/2001 1:59:10 PM
|
PLM01-00783
| Plumbing Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 3/21/2001 10:54:33 AM
|
PLM01-00787
| Water and/or Sewer | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 3/21/2001 10:51:51 AM
|
PLM01-00743
| Sprinkler (Final) | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 3/21/2001 11:14:00 AM after 2pm will be ready
|
PLM01-00304
| Final | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
###-####
|