BLD01-00223
| BLD-Conference | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Wendy 11:30 need soil eng to ok soil for footigs 3/21/2001 12:07:16 PM
|
BLD00-02396
| BLD-Final | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PASS |
|
|
michael ###-#### please call before you go out ok for perm occ after code inforcement signature is na 3/21/2001 5:04:17 PM
|
BLD98-02865
| BLD-Final | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 15:14:22. Contact: ###-####. 3/21/2001 11:39:38 AM
|
BLD98-02866
| BLD-Final | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 15:18:22. Contact: ###-####.
|
BLD01-00671
| BLD-Footing | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PART |
|
|
###-#### wip 3/21/2001 10:49:09 AM
|
BLD01-00671
| BLD-Footing | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | A | PART |
|
|
###-#### wip 3/21/2001 10:49:18 AM
|
BLD01-00195
| BLD-Framing/Rough-in | 3/20/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 415 On 3/20/2001 4:53:56 PM re-inspect shear ok by 415 3/21/2001 1:39:13 PM
|
BLD00-01593
| BLD-Final | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | PASS |
|
|
fn occ brad ###-####
|
MEC01-00484
| Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 09:47:39. Contact: ###-####.
|