BLD01-02848 BLD-Framing/Rough-in3/13/20023/21/20023/21/2002 12:00:00 AMAPART
###-#### or ###-#### Les c/n stands.wip 3/21/2002 11:00:39 AM
BLD02-00110 BLD-Framing/Rough-in3/20/20023/21/20023/21/2002 12:00:00 AMAPART
RICHARD ###-#### need spreader bars for primtor will check at final./ need single function hardware. 3/21/2002 2:32:38 PM
BLD01-01646 BLD-Final3/20/20023/21/20023/21/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/20/2002 at 12:08:51. Contact: ###-####. final ok c/n made ok. 3/21/2002 11:32:58 AM
BLD01-00398 BLD-Final3/20/20023/21/20023/21/2002 12:00:00 AMANR
###-#### DENNIS wip 3/21/2002 11:00:51 AM
BLD01-01809 BLD-Final3/20/20023/21/20023/21/2002 12:00:00 AMANR
###-#### DENNIS wip 3/21/2002 11:01:04 AM
BLD02-00498 BLD-Footing3/20/20023/21/20023/21/2002 12:00:00 AMAPASS
ft insp mike- ###-#### ft ok rebar ok. 3/21/2002 11:15:10 AM
BLD01-03151 BLD-Final3/21/20023/21/20023/21/2002 12:00:00 AMPFAIL
###-#### ROD need fire chalking under rated counter top bothsides/ trip test. 3/21/2002 3:36:03 PM
BLD01-02436 BLD-Framing/Rough-in3/20/20023/21/20023/21/2002 12:00:00 AMPNR
###-#### ROLAINE need ele r/i c/n.need 3@2x8 for header at bearing wall. 3/21/2002 2:55:34 PM