BLD98-03705
| BLD-Foundation | 3/20/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 09:35:33. Contact: . rebar placement in progress at north wall; correction issued re maintenence of s.w. stair tower exit from bank bldg...need proposal for exit "protection" by 3-29 3/21/2002 11:17:48 AM
|
BLD00-01649
| BLD-Final | 3/20/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | A | PASS |
|
|
###-#### MEL c/n ok. ok for perm c/o. 3/21/2002 10:13:04 AM
|
BLD99-03383
| BLD-Conference | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 3/21/2002 9:49:49 AM rec'd Final Mti report verifying proper adhesion of fireproofing, c/n ok. 3/21/2002 10:14:03 AM
|
BLD99-03383
| BLD-Final | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 3/21/2002 10:06:49 AM c/n ok...ok for perm l/c only. 3/21/2002 11:18:23 AM
|
MIS01-00246
| BLD-Conference | 3/18/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 3/18/2002 4:14:55 PM need BLD permit per Marlene...gave til Friday to obtain, verify elec. permit...new windows & roof being installed after fire. Owner is obtaining permit(s) as req'd. 3/21/2002 8:59:32 AM
|
BLD02-00472
| BLD-Framing/Rough-in | 3/19/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | PASS |
|
|
###-#### STEVE CELL ###-####
|
BLD99-03383
| BLD-Final | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 3/21/2002 10:15:08 AM ok for l/c 3/21/2002 2:09:07 PM
|
BLD02-00301
| BLD-Final | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | PASS |
|
|
Corey, ###-#### demo ok 3/21/2002 3:17:04 PM
|
BLD01-02607
| BLD-Conference | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/21/2002 3:50:59 PM w/ bldr re possible plan modification
|
MEC02-00757
| Final | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/21/2002 4:53:17 PM c/n ok
|
BLD01-02415
| BLD-Framing/Rough-in | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 07:56:57. Contact: ###-####. c/n re new & exist corridors...ok to cover office walls 3/21/2002 3:15:54 PM
|
BLD01-01928
| BLD-Final | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 09:29:13. Contact: ###-####. ok for l/c, c/n ok 3/21/2002 3:16:44 PM
|
BLD01-03163
| BLD-Framing/Rough-in | 3/21/2002 | 3/21/2002 | 3/21/2002 12:00:00 AM | P | PART |
|
|
shear wall justin ###-#### hd's, sheqarwall nailing ok; ok to side 3/21/2002 3:42:23 PM
|