FIR05-00103
| INSP-Sprinkler Rough-in | 3/17/2005 | 3/21/2005 | 3/21/2005 12:00:00 AM | P | CANC |
|
|
To be re-scheduled due to United water tap. 3/21/2005 2:49:18 PM
|
FIR05-00110
| INSP-Final Inspection | 3/21/2005 | 3/21/2005 | 3/21/2005 12:00:00 AM | P | FAIL |
|
|
Contact: ###-#### Overhead hydro fail. Rough in inspection okd ,except 2nd floor heads too far from deck, 2nd floor heads also need to be 200 degree per plan. Last hanger on end 1 1/4 branch lines must be within 48 in. 3/21/2005 2:47:15 PM
|
BLD04-00094
| FIRE-Final Inspection | 3/21/2005 | 3/21/2005 | 3/21/2005 12:00:00 AM | P | FAIL |
|
|
dan; Phone #: ###-#### Need fire sprinkler permit for the modified underground that is being installed. Bill Alexander and I spoke to Phil and Stan with St. Lukes construction about this issue. 3/21/2005 4:24:15 PM
|