FIR06-00953
| INSP-Final Inspection | 3/21/2007 | 3/21/2007 | 3/21/2007 5:03:04 PM | P | PASS |
|
|
Permit finaled
|
FIR07-00241
| INSP-Sprinkler Rough-in/Hydro | 3/21/2007 | 3/21/2007 | 3/21/2007 5:02:25 PM | P | PASS |
|
|
Sprinkler piping is ok to cover
|
FIR07-00183
| INSP-Sprinkler Rough-in | 3/21/2007 | 3/21/2007 | 3/21/2007 5:01:28 PM | P | PASS |
|
|
Sprinkler piping is ok to cover. Larren had to relocate an armover as I waited.
|
BLD06-03110
| FIRE-Final Inspection | 3/20/2007 | 3/21/2007 | 3/21/2007 2:49:41 PM | P | PASS |
|
|
life safety passed
|
FIR06-00777
| INSP-Sprinkler Rough-in/Hydro | 3/20/2007 | 3/21/2007 | 3/21/2007 2:43:12 PM | A | FAIL |
|
|
This is an overhead hydro which failed. The test was done twice today but did not hold pressure.
|
FIR06-00791
| INSP-Final Inspection | 3/21/2007 | 3/21/2007 | 3/21/2007 2:21:01 PM | P | PASS |
|
|
permit finaled
|
FIR07-00218
| INSP-Sprinkler Rough-in | 3/20/2007 | 3/21/2007 | 3/21/2007 1:19:22 PM | A | PASS |
|
|
Rough-in passed. Sprinkler piping is ok to cover.
|
FIR07-00095
| INSP-Final Inspection | 3/19/2007 | 3/21/2007 | 3/21/2007 11:11:58 AM | A | PASS |
|
|
permit finaled
|
FIR06-00728
| INSP-Sprinkler Rough-in | 3/20/2007 | 3/21/2007 | 3/21/2007 11:06:31 AM | A | PART |
|
|
This is a 24 hour air test. Test started at 11:00am with 40psi on the guage.
|
FIR06-00641
| INSP-Sprinkler Rough-in/Hydro | 3/20/2007 | 3/21/2007 | 3/21/2007 9:59:17 AM | A | PASS |
|
|
24 hour air test on the dry system passed.
|