BLD12-00303
| FIRE-Conference | 3/21/2012 | 3/21/2012 | 3/21/2012 3:33:40 PM | P | DONE |
|
|
Carmen and I discussed the correction items and what I needed to sign off.
|
FIR12-00056
| INSP-Final Inspection | 3/20/2012 | 3/21/2012 | 3/21/2012 2:59:49 PM | P | CANC |
|
|
Cancel per Troy until the ceiling tile is installed.
|
BLD12-00121
| FIRE-Final Inspection | 3/21/2012 | 3/21/2012 | 3/21/2012 2:39:47 PM | P | PASS |
|
|
life safety passed
|
BLD12-00507
| FIRE-Final Inspection | 3/20/2012 | 3/21/2012 | 3/21/2012 2:39:10 PM | A | FAIL |
|
|
Provide sticker at the main exit as discussed. Provide lever single action hardware at the rear door and remove the steel bar/bracket barrier that is currently blocking the door.
|
FIR11-00517
| INSP-Sprinkler Rough-in | 3/20/2012 | 3/21/2012 | 3/21/2012 2:38:02 PM | A | PASS |
|
|
See the fourth floor of the city approved plans for additional rooms where the sprinkler piping can be covered. I noted that there was an open sprinkler pipe above the ceiling of the trash room.
|
FIR12-00056
| INSP-Sprinkler Rough-in/Hydro | 3/20/2012 | 3/21/2012 | 3/21/2012 10:40:38 AM | A | PASS |
|
|
The overhead hydro test passed.
|
FIR12-00110
| INSP-Sprinkler Rough-in/Hydro | 3/21/2012 | 3/21/2012 | 3/21/2012 10:23:35 AM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR12-00024
| INSP-Final Inspection | 3/20/2012 | 3/21/2012 | 3/21/2012 10:22:39 AM | A | PASS |
|
|
Permit finaled
|