BLD13-00614
| FIRE-Final Inspection | 3/21/2013 | 3/21/2013 | 3/21/2013 3:48:56 PM | P | PASS |
|
|
life safety passed
|
FIR13-00074
| INSP-Sprinkler Rough-in | 3/19/2013 | 3/21/2013 | 3/21/2013 3:44:55 PM | P | PASS |
|
|
Sprinkler piping above the first floor "shower room" is ok to cover. See city approved plans for locations.
|
BLD13-00122
| FIRE-Conference | 3/20/2013 | 3/21/2013 | 3/21/2013 2:06:29 PM | A | DONE |
|
|
Went over life safety requirements withJohn Saucerman Phone #: ###-####
|
BLD13-00112
| FIRE-Final Inspection | 3/20/2013 | 3/21/2013 | 3/21/2013 9:01:51 AM | A | FAIL |
|
|
The city approved plans are not on site. I discussed procedure with boyd Phone #: ###-####
|