MIS17-00146
| MIS-Aging Inspection | 3/21/2018 | 3/21/2018 | 3/22/2018 3:07:38 PM | | DONE |
|
|
|
BLD17-03407
| BLD-Conference | 3/21/2018 | 3/21/2018 | 3/22/2018 3:04:02 PM | P | NR |
|
|
status of fence/barrier
|
BLD17-04309
| BLD-Framing/Rough-in | 3/21/2018 | 3/21/2018 | 3/21/2018 3:57:42 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nancy Frost,, need engineering/okay or fix on tall walls,, other issues ok now
|
BLD17-02818
| BLD-Final | 3/21/2018 | 3/21/2018 | 3/21/2018 3:56:38 PM | P | PASS |
|
|
Larry Phone #: ###-####
|
BLD17-02818
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 3:56:32 PM | P | PASS |
|
|
c of o issued
|
BLD17-02816
| BLD-Final | 3/21/2018 | 3/21/2018 | 3/21/2018 3:56:12 PM | P | PASS |
|
|
Larry Phone #: ###-####
|
BLD17-02816
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 3:55:46 PM | P | PASS |
|
|
c of o issued
|
BLD17-03368
| BLD-Wall Bracing | 3/19/2018 | 3/21/2018 | 3/21/2018 2:45:22 PM | P | PASS |
|
|
SHEAR // John Phone #: ###-####,, exterior shear ok..
|
BLD17-03252
| BLD-Final | 3/21/2018 | 3/21/2018 | 3/21/2018 12:40:12 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by joey benart,, needs a protection post in front of water heater/furnace, fire caulk,, exterior siding seal around wires,, etc
|
MIS17-00369
| BLD-Conference | 3/7/2018 | 3/21/2018 | 3/21/2018 12:37:47 PM | A | DONE |
|
|
Issue 5 day N&O to obtain permits and approval for an ADU if property appears to be occupied as such.//status
|
BLD17-04037
| BLD-Wall Bracing | 3/20/2018 | 3/21/2018 | 3/21/2018 12:37:23 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jaysen Porter,, need to re-do
|
BLD17-01036
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 12:34:19 PM | P | PASS |
|
|
|
BLD17-04309
| BLD-Framing/Rough-in | 3/20/2018 | 3/21/2018 | 3/21/2018 11:40:13 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Nancy Frost,, conf with framer
|
BLD17-03407
| BLD-Conference | 3/15/2018 | 3/21/2018 | 3/21/2018 10:59:02 AM | A | FAIL |
|
|
status of fence/barrier,, not up yet,, called Logan Patten and left a messege that this was the last day for the barrier 5 day notice,, he had called me on March 16th at 10:45 am and told me that they would have the fence up and should be calling for a footing inspection on the 19th,, nothing yet,, he also informed me that they are going to split the property to add more homes when they get central water to it.
|
MIS18-00096
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 10:38:11 AM | P | PASS |
|
|
permit issued
|
BLD18-00195
| BLD-Final | 3/20/2018 | 3/21/2018 | 3/21/2018 10:37:28 AM | A | PASS |
|
|
Call 15 mins aheadm store opens at 9 - Brian Phone #: ###-####
|
BLD18-00195
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 10:37:18 AM | P | PASS |
|
|
damage has been repaired,, signed papers
|