BLD17-02866
| BLD-Energy code compliance | 3/20/2018 | 3/21/2018 | 3/21/2018 3:26:29 PM | P | PASS |
|
|
Dragan-be sure to do insulation also Phone #: ###-####
|
BLD17-02866
| BLD-Framing/Rough-in | 3/20/2018 | 3/21/2018 | 3/21/2018 3:26:12 PM | P | PASS |
|
|
Dragan-be sure to do insulation also-phone is ###-####
|
BLD17-04025
| BLD-Final | 3/21/2018 | 3/21/2018 | 3/21/2018 2:34:32 PM | P | PASS |
|
|
Chad Phone #: ###-####. Ok for perm occ.
|
BLD17-01641
| BLD-Foundation | 3/21/2018 | 3/21/2018 | 3/21/2018 1:55:52 PM | P | PASS |
|
|
Jose Phone #: ###-####
|
BLD16-04456
| BLD-Wall Bracing | 3/21/2018 | 3/21/2018 | 3/21/2018 1:50:09 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. . Missing straps, nailing and holdowns.
|
BLD16-04455
| BLD-Wall Bracing | 3/21/2018 | 3/21/2018 | 3/21/2018 1:49:40 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Missing straps, nailing and holdowns.
|
BLD18-00869
| BLD-Footing | 3/20/2018 | 3/21/2018 | 3/21/2018 1:11:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by anthony bryant
|
BLD18-00119
| BLD-Final | 3/20/2018 | 3/21/2018 | 3/21/2018 11:41:13 AM | A | PASS |
|
|
Korrey Phone #: ###-####
|
BLD18-00119
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 11:40:59 AM | P | PASS |
|
|
|
BLD18-00892
| BLD-Final | 3/20/2018 | 3/21/2018 | 3/21/2018 10:01:40 AM | A | DONE |
|
|
Andy Phone #: ###-####
|
BLD18-00892
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 10:01:33 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD18-00816
| BLD-Framing/Rough-in | 3/20/2018 | 3/21/2018 | 3/21/2018 9:33:17 AM | A | NR |
|
|
Parker Phone #: ###-####. Needs to obtain electrical permit and get rough in inspection.
|
BLD17-00058
| BLD-Final | 3/20/2018 | 3/21/2018 | 3/21/2018 9:28:49 AM | A | PART |
|
|
late am please Phone #: ###-#### Inspection requested via web by Roger Graves. Ok for temp occ. Needs smoke and flame spread values for foam plastics on walk in cooler and can not verify tempered glazing in door to office.
|
MIS18-00079
| BLD-Conference | 3/7/2018 | 3/21/2018 | 3/21/2018 8:52:31 AM | A | PASS |
|
|
Check on status. Issue 5 day notice if needed.
|
MIS18-00079
| DOC - Permit Finaled | 3/21/2018 | 3/21/2018 | 3/21/2018 8:52:24 AM | P | PASS |
|
|
origanal owner, no work. construction materils in parking area, placed neatly.
|
BLD17-04023
| BLD-Footing | 3/20/2018 | 3/21/2018 | 3/21/2018 8:49:45 AM | A | PASS |
|
|
call about plans // Jim Phone #: ###-####
|