Inspections for the day of: Wednesday, March 21, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00594 FIR-Aging Inspection3/21/20183/21/20183/28/2018 10:29:07 AM DONE
Sent a follow up message to the permit holding contractor, Don at phone# ###-####, to try and get this inspection completed and finaled.
FIR17-00317 INSP-Sprinkler Rough-in/Hydro3/20/20183/21/20183/21/2018 2:25:53 PMPPART
Hydrostatic test complete for levels 2, 3, 4 and 5 overhead fire sprinkler piping as well as wet standpipe/floor supply for sprinklers witnessed, no pressure loss observed at contractor provided gauge at main riser. Level 1 and 6 inch wet standpipe to have hydrostatic test dome at a later date.
FIR17-00627 INSP-Sprinkler Rough-in/Hydro3/21/20183/21/20183/21/2018 2:21:35 PMPDONE
Underground hydrostatic test witnessed, no pressure loss observed at contractor provided supply gauge.
BLD17-04681 FIRE-Final Inspection3/21/20183/21/20183/21/2018 2:20:20 PMPPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
FIR18-00089 INSP-Final Inspection3/20/20183/21/20183/21/2018 2:19:18 PMPPASS
Final fire alarm inspection for area of work complete.
FIR18-00101 INSP-Final Inspection3/19/20183/21/20183/21/2018 2:16:56 PMAPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00126 INSP-Final Inspection3/20/20183/21/20183/21/2018 11:02:17 AMAPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00038 INSP-Final Inspection3/20/20183/21/20183/21/2018 11:01:41 AMAPASS
Final fire sprinkler inspection for area of work complete.
FIR17-00590 INSP-Final Inspection3/20/20183/21/20183/21/2018 11:00:55 AMAPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00231 INSP-Sprinkler Rough-in3/20/20183/21/20183/21/2018 9:11:22 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover.
FIR17-00536 INSP-Final Inspection3/20/20183/21/20183/21/2018 8:54:15 AMAPASS
Final commercial hood fire suppression system inspection complete.
FIR17-00627 INSP-Sprinkler Rough-in/Hydro3/21/20183/21/20183/21/2018 7:29:09 AMAFAIL
Undergound supply lost 7 PSI during hydro, underground will have to be re-tested.
FIR17-00689 INSP-Sprinkler Rough-in/Hydro3/15/20183/21/20183/21/2018 7:27:49 AMAPART
Rough to cover inspection for overhead fire sprinkler above hardlids on mezzanine level complete, notated city approved drawings with green highlighter/red ink area approved for cover.
FIR17-00689 INSP-Supply line flush3/15/20183/21/20183/21/2018 6:00:24 AMPCANC
Gabe Garduno is the contact for this flush. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR17-00689 INSP-Supply line flush3/20/20183/21/20183/21/2018 5:59:42 AMADONE
Underground main line flush complete.