ELE98-04087
| INSP - Electrical Rough-In | 3/19/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | A | PASS |
|
|
03/21/99 403 - ###-#### RICK//RI REINSPECT PLEASE CALL TO MEET YOU BASEMENT R/I.
|
ELE99-00847
| INSP - Final | 3/19/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | A | FAIL |
|
|
03/21/99 403 - ###-#### MIKE//FINAL NEC: 680-6: RECEPTICLE WITHIN 20FT. OF SPA SHALL BE GFCI. NEC: 680-40-(D)(4): ALL METAL WITHIN 5FT OF WALLS OF SPA SHALL BE BONDED.
|
ELE99-00926
| INSP - Electrical Rough-In | 3/19/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | A | PART |
|
|
03/21/99 403 - ###-#### JOHN/VOICE PGR/ RI REMODEL METER/PANEL RELOCATION NEEDS UFER GROUND IN NEW FOUNDATION UPON INSTALLA
|
ELE99-00932
| INSP - Final | 3/19/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | A | PASS |
|
|
03/21/99 403 - temp pole\\###-#### chris OK
|
ELE98-03344
| INSP - Final | 3/19/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | P | FAIL |
|
|
03/22/99 403 - ###-#### final NO ACCESS; CALLED CONTRACTOR, WILL RESCHEDULE.
|
ELE98-04145
| INSP - Final | 3/22/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | P | PASS |
|
|
03/22/99 403 - ###-#### ed call first CORRECTIONS COMPLETED
|
ELE99-00237
| INSP - Final | 3/19/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | P | NH |
|
|
03/22/99 403 - ###-#### final for kitchen CONTRACTOR WILL RESCHEDULE.
|
ELE99-00766
| INSP - Electrical Rough-In | 3/22/1999 | 3/22/1999 | 3/22/1999 12:00:00 AM | P | PASS |
|
|
03/22/99 403 - ###-#### WADE//CEILING GRID OK
|