MEC00-00910
| Final | 3/21/2000 | 3/22/2000 | 3/23/2000 12:00:00 AM | P | NH |
|
|
###-####
|
MEC99-04074
| Final | 3/22/2000 | 3/22/2000 | 3/23/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/22/2000 at 09:20:27. Contact: ###-####.
|
BLD00-00547
| BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 12:00:00 AM | A | PART |
|
|
###-####
|
BLD98-02492
| BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 12:59:46. Contact: ###-####. truss engineer to field review and respond to truss conections hc2a/hc2b to verrify that design values have been achived. truss engineer to give min. load bearing at#13 truss hc1. seal draftt stops. missing sprinkler at south stair attic space. 3/22/00 10:55:19 AM
|
BLD98-01861
| BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 13:44:07. Contact: ###-####. fram and insulation ok firewall okScheduled by a contractor via Hello! on 03/21/2000 at 13:44:07. Contact: ###-####. 3/23/00 11:36:27 AM
|
BLD99-02974
| BLD-Foundation | 3/21/2000 | 3/22/2000 | 3/22/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 14:11:41. Contact: ###-####. rebar ok pending special insp. report on concrete samples. 3/22/00 11:51:49 AM
|
MEC00-00723
| Rough-in | 3/22/2000 | 3/22/2000 | 3/22/2000 12:00:00 AM | P | PASS |
|
|
###-####call first John ###-####
|
BLD00-00276
| BLD-Foundation | 3/22/2000 | 3/22/2000 | 3/22/2000 12:00:00 AM | P | PASS |
|
|
###-#### MITCH//REBAR rebar west half of bld. ok pending special insp. report on concrete. 3/22/00 3:23:18 PM
|