MEC01-00786
| Final | 3/21/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 12:35:04. Contact: ###-####. #420 took 4 me, he is in the area 3/22/2001 9:06:44 AM
|
BLD01-00183
| BLD-Foundation | 3/21/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | A | PART |
|
|
###-####
foundation poured, forms stripped, looks ok 3/22/2001 9:26:42 AM
|
BLD00-02728
| BLD-Final | 3/21/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | A | FAIL |
|
|
###-####
c/n posted, hand rails, temp. windows, smoke detectors 3/22/2001 10:21:51 AM
|
BLD01-00446
| BLD-Foundation | 3/20/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 3/20/2001 1:39:28 PM
wip, ok w/ verbal corrections 3/22/2001 9:18:58 AM
|
BLD01-00023
| BLD-Framing/Rough-in | 3/22/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | A | FAIL |
|
|
###-####
ok to cover warm wall, c/n posted to be fixed by final 3/23/2001 10:41:35 AM
|
BLD00-03310
| BLD-Framing/Rough-in | 3/21/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | P | PART |
|
|
fr larry-- ###-####
c/n, ok to insulate 3/22/2001 1:17:03 PM
|
BLD01-00608
| BLD-Framing/Rough-in | 3/21/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 12:07:46. Contact: ###-####.
ok to cover pending other trades 3/22/2001 10:52:17 AM
|
BLD01-00670
| BLD-Footing | 3/22/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | P | PART |
|
|
###-#### wip, ok w/ verbal corrections 3/22/2001 1:28:06 PM
|
BLD00-01496
| BLD-Framing/Rough-in | 3/22/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | P | PASS |
|
|
c/n ok 3/22/2001 1:18:51 PM
|
BLD00-01496
| BLD-Energy code compliance | 3/22/2001 | 3/22/2001 | 3/22/2001 12:00:00 AM | P | PASS |
|
|
ok to cover 3/22/2001 1:19:04 PM
|