Inspections for the day of: Friday, March 22, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01044 BLD-Framing/Rough-in3/21/20023/22/20023/22/2002 12:00:00 AMAPART
fr dick- ###-#### ; walls ok to cover 3/22/2002 12:13:07 PM
BLD01-03233 BLD-Framing/Rough-in3/21/20023/22/20023/22/2002 12:00:00 AMAFAIL
###-#### JOE 2nd c/n posted at sit...Dryer vent tooc lose to window, fireblocks, blocking at floor, insul face paper, etc...post c/n & permit, address onsite; fire r/i to be complete or $42 fee due. 3/22/2002 10:05:56 AM
BLD01-03233 BLD-Energy code compliance3/21/20023/22/20023/22/2002 12:00:00 AMAFAIL
###-#### JOE
BLD02-00569 BLD-Foundation3/21/20023/22/20023/22/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/21/2002 at 17:18:26. Contact: ###-####. slab ok to pour; col. ftg ok. 3/22/2002 11:12:40 AM
BLD98-03705 BLD-Footing3/20/20023/22/20023/22/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/20/2002 at 09:36:06. Contact: .ftg ok pend MTI report; keep c/n re exit maintenence proposal & ecology block retaining wall. 3/22/2002 12:14:42 PM
BLD01-03008 BLD-Foundation3/22/20023/22/20023/22/2002 12:00:00 AMAPART
Added by Inspector: 340 On 3/22/2002 11:04:08 AM ok to pour garage portion; noted missed holdowns at various locations all ready poured...advised sub contractor to retro-fit equivalent hold-downs or contact engineer for alternate; no hds called for at garage front!
BLD01-03233 BLD-Conference3/22/20023/22/20023/22/2002 12:00:00 AMAPASS
Scheduled by Inspector: 340 On 3/22/2002 11:37:30 AM call Troy chk for sprinkler approval or $42 fee due... 3/22/2002 2:22:22 PM
BLD01-03006 BLD-Final3/22/20023/22/20023/22/2002 12:00:00 AMPPART
fn occ- ###-####- allan ;elec finalled on card 3/22/2002 1:36:51 PM c/n; door closer, ok for t/o 3/22/2002 2:26:27 PM
BLD01-00594 BLD-Final3/22/20023/22/20023/22/2002 12:00:00 AMPFAIL
###-#### dave c/n, stair rails, other finals, etc. 3/22/2002 3:59:55 PM
BLD01-00603 BLD-Final3/22/20023/22/20023/22/2002 12:00:00 AMPFAIL
###-#### dave c/n, rails, finals 3/22/2002 4:01:49 PM
BLD01-00595 BLD-Final3/22/20023/22/20023/22/2002 12:00:00 AMPFAIL
###-#### dave c/n, stair rails.. 3/22/2002 6:22:22 PM
BLD00-03729 BLD-Framing/Rough-in3/21/20023/22/20023/22/2002 12:00:00 AMPPART
###-#### bruce
hard lid frames in misc. rooms noted on job inspection card, bishop lounge wall cover, ok to cover 3/22/2002 2:59:04 PM
BLD02-00273 BLD-Framing/Rough-in3/21/20023/22/20023/21/2002 12:00:00 AMACANC
###-#### DEWEY ###-####